Stop planning products.
Start building them.
Research, validate, and ship — all from one workspace.
Requirements
Redesign /checkout step 3 to reduce drop-off 34% → target 18%
Reuse PaymentForm component — avoid duplicating Stripe SDK init
Evaluate Apple Pay parity — competitor added Q4, 38% iOS share
Tag checkout_complete in Amplitude for success metric tracking
Status
The more context you give, the smarter the output.
Paste your product URL. Upload a doc. Connect a data source. Vantage turns your context into product intelligence — not generic advice.
Add a checkout flow to the product.
Consider user experience best practices.
Implement payment processing.
Add error handling for failed payments.
Redesign /checkout step 3 (payment) to reduce Stripe drop-off from 34% → target 18%.
Reuse PaymentForm component from /components/checkout — avoid duplicating Stripe SDK init.
Competitor Acme added Apple Pay in Q4 — evaluate parity given 38% iOS share.
Success metric: checkout conversion in Amplitude — tag event checkout_complete.
Your product context is scattered across every tool your team uses.
Every PRD you write is missing context that lives in your comms, your codebase, or last quarter's analytics. Every ticket is written without the full picture. That's not a workflow problem — it's a context problem.
“Building is no longer the constraint — deciding what to build is. A prototype shows what. The spec explains why, how you'll measure, and when you'll pull the plug.”
— Taste at Speed, Aakash Gupta
From idea to execution plan in under 3 hours.
Four steps. No prescribed sequence. PRD and tickets stay in sync the whole way.
Describe
Type your idea or paste your product URL. That's all you need to start.
Add context
Connect sources, upload docs, describe your flow. The more context, the smarter the output.
Generate
PRD, prototype, or both — your choice, either order. No prescribed sequence.
Execute
Dependency-aware tickets, agent prompts, or let AI agents build it. PRD and tickets stay in sync.
Most teams go from blank page to execution plan in under 3 hours.
Three things that make every PM faster.
Research, context, and execution — connected in one workspace so nothing falls through the cracks.
Research while you write
Ask anything about your market, competitors, or product — right inside the editor. Every answer comes with traceable citations you can verify and insert directly into the PRD. Your PRD is evidence-backed, not opinion-backed.
Every claim citedYour product, understood
Paste your URL. Upload your docs. Connect your data. Vantage indexes your product context and gets smarter with everything you add. Ask 'are my requirements conflicting?' and get an answer about YOUR product, not generic advice.
Context compoundsPlan to action, one click
Generate dependency-aware tickets with effort estimates and execution waves. Groom them with your team in a conversational chat. Export to Linear or copy structured prompts for Cursor. PRD and tickets stay in sync — always.
PRD → tickets in 1 clickThe workspace where PMs become builders
Research and requirements, side by side. Always in sync.
OAuth2 + email/password login with MFA support
AI-powered structured PRD from natural language input
Web + product context search with citation support
Dependency-aware tickets from PRD requirements
Bidirectional sync with Linear project boards
Teams that use AI-assisted PRD generation report 40% faster planning cycles and significantly higher requirement completeness scores...
The core limitation of general-purpose docs for product work is the lack of structured data. Requirements need IDs, priorities, and traceability...
For R1: PKCE flow recommended for web apps. Support at minimum Google and GitHub OAuth providers alongside email/password...
Claude generates a document. Vantage runs a system.
Vantage makes every tool you already use more effective — because it carries the full product context.
- No memory between sessions — starts from scratch every time.
- PRD drifts from tickets by week 2 of the sprint.
- No conflict detection — two teams can build contradictory things.
- Forgets your product context every conversation.
- Product context compounds over time — every PRD makes the next one smarter.
- PRD and tickets always in sync — edit a requirement and affected tickets update.
- Conflict detection across requirements and across PRDs in the same org.
- Gets smarter with every project. Context persists at the org level.
The data on prototype-first shipping
Numbers from Anthropic's Claude Code team and Aakash Gupta's research on 224,000+ PMs
Top prototype-first teams kill 4 in 5 versions. That's not failure. That's the job.
Claude Code writes ~80% of code. Engineers focus on what only they can do.
PMs using AI-native workflows reclaim entire days every week.
What PMs are saying
Finally a tool that actually knows what I'm building. Every other AI just gives me templates.
PRD to tickets in 30 minutes. That used to take the better part of a week.
Context-aware output changed everything. It references our actual codebase, not generic advice.
I shipped 3 features in the time I used to spend writing one PRD. The ticket generation is insane.
The conflict detection caught a clash between two parallel workstreams before it became a sprint blocker.
Compliance check in the PRD phase saved us from a last-minute legal review. Worth it for that alone.
Finally a tool that actually knows what I'm building. Every other AI just gives me templates.
PRD to tickets in 30 minutes. That used to take the better part of a week.
Context-aware output changed everything. It references our actual codebase, not generic advice.
I shipped 3 features in the time I used to spend writing one PRD. The ticket generation is insane.
The conflict detection caught a clash between two parallel workstreams before it became a sprint blocker.
Compliance check in the PRD phase saved us from a last-minute legal review. Worth it for that alone.
Simple, transparent pricing
Start free. Upgrade when you need to ship faster.
Perfect for exploring Vantage and your first PRDs.
- 3 PRDs / month
- 20 queries / month
- Basic PRD templates
- Web search (no product context)
- Export to Markdown
For PMs who want to move fast and ship with confidence.
- Unlimited PRDs
- Unlimited queries
- Full context engine (docs, screenshots, crawl)
- Intelligent ticket generation
- Agent prompts for Cursor
- Export to Linear
- Grooming chat
- Change propagation
- Priority support
For product teams that need integrations, multiplayer, and sync.
- Everything in Pro
- Multiplayer editing
- Bidirectional Linear sync
- Slack integration
- SSO / SAML
- Admin dashboard
- Dedicated onboarding
- SLA support
All plans include a 14-day free trial. No credit card required to start.
The PM's role is changing. Build the future of it.
Engineers have Cursor. Designers have Figma. Now PMs have Vantage.
No sign-up needed to start · No credit card required