The AI Operating System for
Product Managers.
What changed. What conflicts. What needs a decision.
Caught, connected, and waiting for your call.
Rollback Stripe SDK?
Conversion ↓ 12%
Payment refactor
3 weeks stale
Blocked by API team
3 comments
CHK-91 → next sprint
Where is the spec?
D7 retention ↓ 8%
Your Monday morning.
See what your customers are really telling you.
Paste a meeting transcript, support thread, or customer feedback.
Vantage extracts every signal and shows you what to build next.
How Vantage works
Stay on top. Act on signals. Build from one place.
From chasing updates across five tools to making the calls that move products forward.
Keep your tools. Add intelligence.
Connect in 2 minutes. When something changes in one tool, every affected project knows.
Payment drop-off up 34% after Stripe SDK update. Mobile accounts for 78% of regression.
Every morning, know what matters.
Cross-product conflicts, dependency changes, open decisions. Caught and waiting for your call.
PRD
4 requirements generated
Tickets
3 synced to Linear
Prototype
2 variants, shareable link
Brainstorm, spec, prototype, ship.
Specs, prototypes, tickets, compliance. All grounded in your actual project data.
Your morning briefing. Before standup.
Vantage watches your projects overnight. By 9am, you know what changed, what conflicts, and what needs your decision. Without checking anything manually.
Good morning, Alex
3 things need your attention this morning
Auth flow conflict: Project X vs Project Y
R4 assumes password auth. R2 mandates SSO. Detected from published requirements.
Prototype is stale
Requirements R3 and R7 changed yesterday. Prototype was generated before these changes.
GDPR compliance gap in requirement R12
Personal data processing without consent mechanism. Flagged during last document publish.
“Conflicts between our parallel products were only discovered after engineering shipped. By then it cost sprints, not hours. Vantage catches that at the requirements stage now.”
Context shifts. Everything rebuilds.
Like a code review for product decisions. Add new context, review the diff, commit. Nothing updates silently.
New context added
Engineering just estimated Apple Pay at 3 sprints. Your PM adds the Slack thread as context and hits Re-index.
Vantage shows you what changed
2 requirements updated · 5 artifacts impacted
Add Apple Pay as primary payment method
Deprioritize Apple Pay (~3 sprints). Keep existing methods. Revisit Q3.
Support Stripe SDK v6 and v7 simultaneously
Migrate fully to Stripe v7. Drop v6 support. Breaking change in v7.2.
5 changes accepted · Rebuilt in 4.2 seconds
PRD, tickets, and prototype updated. Linear synced.
PRD v3
2 sections rewritten
Tickets
1 removed, 1 added
Prototype
Variant B flagged
Compliance
PCI-DSS re-checked
Nothing goes stale.
“I spent half my week keeping docs, tickets, and Slack threads in sync after every scope change. With Vantage, scope changes rebuild everything. I review a diff and commit. My week back.”
Your tools, connected.
One workspace. No tab switching.
Linear
2-way ticket sync
Jira
2-way ticket sync
Azure DevOps
Work item sync
Asana
Project & tasks
GitHub
Code & patterns
Figma
Design context
Salesforce
Accounts & deals
HubSpot
CRM & tickets
Zendesk
Support tickets
Intercom
Customer data
Amplitude
Product analytics
PostHog
Analytics & flags
Mixpanel
Funnels & cohorts
Gong
Call transcripts
Granola
Meeting notes
Canny
Feature voting
Productboard
Feature requests
Notion
Docs & wikis
Confluence
Wiki & docs
Slack
Decisions & threads
Google Workspace
Docs, Sheets, GA
Datadog
Metrics & alerts
Sentry
Error tracking
PagerDuty
Incidents
LaunchDarkly
Feature flags
Linear
2-way ticket sync
Jira
2-way ticket sync
Azure DevOps
Work item sync
Asana
Project & tasks
GitHub
Code & patterns
Figma
Design context
Salesforce
Accounts & deals
HubSpot
CRM & tickets
Zendesk
Support tickets
Intercom
Customer data
Amplitude
Product analytics
PostHog
Analytics & flags
Mixpanel
Funnels & cohorts
Gong
Call transcripts
Granola
Meeting notes
Canny
Feature voting
Productboard
Feature requests
Notion
Docs & wikis
Confluence
Wiki & docs
Slack
Decisions & threads
Google Workspace
Docs, Sheets, GA
Datadog
Metrics & alerts
Sentry
Error tracking
PagerDuty
Incidents
LaunchDarkly
Feature flags
Linear
2-way ticket sync
Jira
2-way ticket sync
Azure DevOps
Work item sync
Asana
Project & tasks
GitHub
Code & patterns
Figma
Design context
Salesforce
Accounts & deals
HubSpot
CRM & tickets
Zendesk
Support tickets
Intercom
Customer data
Amplitude
Product analytics
PostHog
Analytics & flags
Mixpanel
Funnels & cohorts
Gong
Call transcripts
Granola
Meeting notes
Canny
Feature voting
Productboard
Feature requests
Notion
Docs & wikis
Confluence
Wiki & docs
Slack
Decisions & threads
Google Workspace
Docs, Sheets, GA
Datadog
Metrics & alerts
Sentry
Error tracking
PagerDuty
Incidents
LaunchDarkly
Feature flags
Keep your tools. Add intelligence. Vantage doesn't replace Notion, Linear, or Slack — it connects them.
+ Aha!, Typeform, FullStory, Hotjar, Freshdesk, Monday.com, Trello, Shortcut, and 48 total integrations
Compounding intelligence
It gets smarter the longer you use it.
No setup. No configuration. Every action builds memory. Every project compounds into the next.
Learns how your team works.
Picks up your spec format, ticket style, tech stack, and past decisions. By the third project, it already knows your patterns. No templates. No configuration.
No ramp-up. No “ask Sarah.”
New joiners ship from day one.
A new PM signs in and generates artifacts that match team standards immediately. The institutional memory stays even when people leave.
SSO was deprioritized in Q3 after customer data showed 89% of churned accounts cited billing UX, not access control.
Ask anything. Get a cited answer.
Cited answers in seconds, pulled from your specs, data from any connected tool, and the decision history behind it all. No digging through Slack. No pinging three people who might remember.
What PMs are saying.
I spent half my week keeping docs, tickets, and Slack threads in sync after every scope change. With Vantage, scope changes rebuild everything. I review a diff and commit. My week back.
Saved ~10 hrs/week
Tarak Sawant
Product · Quantiphi
Compliance alone would have saved my biggest project this year. Vantage flagged a GDPR gap before we wrote a line of code. I'd pay for this personally even if my org doesn't adopt it.
Compliance gaps caught pre-build
Khushboo
Product · Dhan · Fintech
Conflicts between our parallel products were only discovered after engineering shipped. By then it cost sprints, not hours. Vantage catches that at the requirements stage now.
Cross-project conflicts caught early
Om Pancholi
Product · The Sleep Company
The generated PRD is one of the best I've seen in the business. It's crisp, not too long, to the point and got everything right.
PRD quality validated
Nikhil
Product · India Today
I spent half my week keeping docs, tickets, and Slack threads in sync after every scope change. With Vantage, scope changes rebuild everything. I review a diff and commit. My week back.
Saved ~10 hrs/week
Tarak Sawant
Product · Quantiphi
Compliance alone would have saved my biggest project this year. Vantage flagged a GDPR gap before we wrote a line of code. I'd pay for this personally even if my org doesn't adopt it.
Compliance gaps caught pre-build
Khushboo
Product · Dhan · Fintech
Conflicts between our parallel products were only discovered after engineering shipped. By then it cost sprints, not hours. Vantage catches that at the requirements stage now.
Cross-project conflicts caught early
Om Pancholi
Product · The Sleep Company
The generated PRD is one of the best I've seen in the business. It's crisp, not too long, to the point and got everything right.
PRD quality validated
Nikhil
Product · India Today
Built for trust.
Enterprise-grade security so you can connect your tools with confidence.
Encrypted in transit
All connections use TLS. Your data is encrypted between your browser, our servers, and our database. Every action is logged.
No model training
We never train on your data. The AI services that process your data are contractually barred from training on it.
Your data, your control
Disconnect any integration or close your account at any time. We remove it from active systems within 30 days.
Pursuing SOC 2 Type II and GDPR compliance. Enterprise security reviews available on request.
Start free. Upgrade when you need more.
The alternative
Hire a junior PM
$85,000 /year
- -Handles 1 project at a time
- -2-week ramp-up per project
- -Manual research across 6+ tools
- -Documents go stale after scope changes
- -No compliance checks
Vantage Business
$59/seat/month
Everything a PM needs. No per-project limits.
- Unlimited projects
- 2-minute setup
- Sourced answers in 30 seconds
- Auto-rebuilds on context change
- Compliance + conflict detection
- Cross-project institutional memory
$0
Try the full workflow. No credit card.
- 1 active project
- 20 queries · 15 edits / mo
- 3 documents · 2 prototypes · 2 journeys
- Ticket generation
- URL + text context
$19/seat/mo
For PMs who ship weekly.
- 10 active projects
- 150 queries · 100 edits / mo
- 10 documents · 8 prototypes · 15 journeys / mo
- All connectors + Linear sync
- Unlimited ticket batches & grooming
- 2 viewer seats included
$59/seat/mo
For teams running on Vantage daily.
- Everything in Pro, unlimited
- Shared team workspace
- Cross-project conflict detection
- Realtime metrics tracking
- 5 viewer seats included
Custom
For organizations with specific needs.
- Everything in Business
- Multiple organizations
- SSO (Google Workspace / SAML)
- Audit log access
- Dedicated support + SLA
No Credit Card Required. Start Free.
Frequently asked questions
Stop being the sync layer.
Connect your tools. See what you've been missing by tomorrow morning.