The AI-native PM workspace.

Your product’s context is scattered across six tools.

Slack threads, PRs, funnel alerts, stale docs and design comments, each in a different place.

Keep Linear, Notion and Slack. Your team doesn’t have to change a thing.

Used by product teams at

India TodayDhanThe Sleep CompanyQuantiphi

The bigger picture · 90 seconds

One decision changes.
Keep the whole product aligned.

Ten minutes to standup. A changed plan. See how Vantage carries the decision through your PRD, prototype and tickets. Then imagine that clarity across ten products.

Find your Vantage point
One workspace

The whole product loop. One place. Always in sync.

From the first customer signal to what shipped and what you learned. Every stage reads from the same context, so a change in one updates the rest.

Six stages, one shared context.

01 · Listen
Every signal, one inbox

Hear every customer. Know what matters.

Feedback from Slack, email, your feedback form and call transcripts lands in one inbox, sorted into themes and scored so you know what to build next.

  • Intake from where feedback already lives

    Slack, email, a web form, plus Zoom, Meet, Gong and Fireflies transcripts.

  • Scored your way

    RICE, WSJF, ICE or MoSCoW. Missing inputs show as “not set”, never guessed.

  • Ask why

    Priority Chat explains any ranking with the evidence behind it.

Feedback inbox

auto-triaged

Slack · #support

“Can we pay with Apple Pay yet?”

Checkout

Gong · Acme renewal call

“Typing card details on mobile is painful.”

Checkout

Email · Northwind

“Export to CSV keeps timing out.”

Export

Feedback form

“Love the new dashboard.”

Praise
ThemeRICEWSJFEvidence
Faster mobile checkout38216 signals
Reliable CSV export24144 signals
Dashboard polish962 signals

Priority Chat

Why is mobile checkout #1? Highest reach: a 12% conversion drop plus 3 customers asking. Effort is medium.

Try it now — no sign-up required

See what your customers are really telling you.

Paste a meeting transcript, support thread, or customer feedback. Vantage extracts every signal and shows you what to build next.

Paste text, drop files, or upload documents
02 · Define
From signal to spec

PRDs, prototypes and journeys from real context.

One context produces all three, and every requirement links back to the quote, call or metric behind it.

  • PRDs your engineers trust

    Grounded in your docs, signals and past decisions, with citations on every requirement.

  • Prototypes and user journeys

    A clickable prototype and the journey it changes, generated from the same spec.

  • Ask your codebase

    Connect GitHub and ask how things work today, before you write the spec.

“The generated PRD is one of the best I’ve seen in the business. Crisp, not too long, to the point.”

Nikhil, Product, India Today
03 · Plan & ship
From spec to shipped

Tickets in the right order. A roadmap that stays honest.

Requirements become dependency-ordered tickets in Linear, and the roadmap shows real health instead of hopeful colors.

  • Dependency-ordered tickets

    Waves that show eng what blocks what. Push to Linear with two-way sync you approve.

  • Roadmap with real health

    Each project shows on track, conflicting or stale, computed from what’s actually happening.

  • Public roadmap, portal and changelog

    Share what’s planned and what shipped, straight from the work.

Roadmap · Q4

health from live signals
Checkout redesignOn track
Mobile app v2Conflict
Auth revampStale
PublicRoadmap and changelog published for customers
Living Context

Context shifts. Everything updates. You stay on top.

This is what your stack can’t do. When a decision changes anywhere, Vantage finds every artifact it touches, shows you the diff, and briefs you every morning on what needs your call.

When context changes

Every morning

Conflicts across projects

Two specs that contradict each other surface at the requirements stage, not in code review.

Nothing goes stale silently

A changed requirement flags the prototype, journey and tickets it affects.

One reviewed diff

Like a code review for product decisions. Review, accept, done.

“I spent half my week keeping docs, tickets and Slack threads in sync after every scope change. With Vantage, scope changes rebuild everything. I review a diff and commit.”

Tarak Sawant, Product, Quantiphi
04 · Automate
Routines

Vantage keeps watching when you don’t.

Set up routines that run on a schedule or when something happens, and use your product context from the AI tools you already work in.

  • Scheduled or event-driven

    Run a check every morning, or whenever an issue is reopened or a doc changes.

  • Results where you work

    Routines post their findings to Slack or email, with sources attached.

  • Your context in Claude

    Connect Vantage’s MCP server or use an API key, and ask about your projects from anywhere.

Routine · Morning spec check

Active
Trigger

Every weekday · 8:00

or when a Linear issue is reopened

Check

Scan PRDs for stale requirements

across all 4 projects

Draft

Summarise what changed overnight

with sources

Deliver

Post to #product in Slack

3 items need a decision

Vantage inside Claude

MCP
What changed in Checkout this week?
R2 (Apple Pay) was deprioritised on Tuesday. The prototype and 1 ticket were updated. 3 sources

Compounding intelligence

It gets smarter the longer you use it.

No setup. No configuration. Every action builds memory. Every project compounds into the next.

Learning from 3 projects
📄Spec format
PRD v2 template
🎫Ticket style
User story + AC
⚙️Stack
React · Node · Stripe
🔺Priority
P0 ships first

Learns how your team works.

Picks up your spec format, ticket style, tech stack, and past decisions. By the third project, it already knows your patterns. No templates. No configuration.

N
New PM generates first PRD
Matches team standards
Spec formatStack contextPast decisions

No ramp-up. No “ask Sarah.”

New joiners ship from day one.

A new PM signs in and generates artifacts that match team standards immediately. The institutional memory stays even when people leave.

Why did we deprioritize SSO?

SSO was deprioritized in Q3 after customer data showed 89% of churned accounts cited billing UX, not access control.

Q3 Planning PRD, Section 4.2
Amplitude: Churn Cohort Analysis
Slack: #product-strategy, Jun 12
3 sources4 seconds

Ask anything. Get a cited answer.

Cited answers in seconds, pulled from your specs, data from any connected tool, and the decision history behind it all. No digging through Slack. No pinging three people who might remember.

For teams
When you’re ready

Start on your own. Bring your team when you’re ready.

Vantage works for one PM on day one. When teammates join, everyone works from the same context, and conflicts between teams surface early.

  • Shared workspace, private drafts

    Published PRDs are visible to the team. Drafts stay invite-only until you publish.

  • Roles that fit how you work

    Admin, editor and viewer, with per-workspace overrides.

  • Conflicts across teams

    When your spec collides with another team’s, Vantage flags it before anyone builds.

Workspace · Payments team

PSAKMR

Checkout redesign

Priya · PM

Published

Mobile app v2

Arjun · PM

Published

Pricing experiment

You

Private draft
PS · AdminAK · EditorMR · Viewer · Eng
ConflictAcross two teams

Mobile app v2 assumes guest checkout. Checkout redesign R3 requires sign-in for saved cards.

Caught at the requirements stage, before either team writes code.

Public roadmap & changelogshareable link
Integrations

Your tools, connected.

One workspace. No tab switching.

Linear

2-way ticket sync

Jira

2-way ticket sync

Azure DevOps

Work item sync

Asana

Project & tasks

GitHub

Code & patterns

Figma

Design context

Salesforce

Accounts & deals

HubSpot

CRM & tickets

Zendesk

Support tickets

Intercom

Customer data

Amplitude

Product analytics

PostHog

Analytics & flags

Mixpanel

Funnels & cohorts

Gong

Call transcripts

Granola

Meeting notes

Canny

Feature voting

Productboard

Feature requests

Notion

Docs & wikis

Confluence

Wiki & docs

Slack

Decisions & threads

Google Workspace

Docs, Sheets, GA

Datadog

Metrics & alerts

Sentry

Error tracking

PagerDuty

Incidents

LaunchDarkly

Feature flags

Linear

2-way ticket sync

Jira

2-way ticket sync

Azure DevOps

Work item sync

Asana

Project & tasks

GitHub

Code & patterns

Figma

Design context

Salesforce

Accounts & deals

HubSpot

CRM & tickets

Zendesk

Support tickets

Intercom

Customer data

Amplitude

Product analytics

PostHog

Analytics & flags

Mixpanel

Funnels & cohorts

Gong

Call transcripts

Granola

Meeting notes

Canny

Feature voting

Productboard

Feature requests

Notion

Docs & wikis

Confluence

Wiki & docs

Slack

Decisions & threads

Google Workspace

Docs, Sheets, GA

Datadog

Metrics & alerts

Sentry

Error tracking

PagerDuty

Incidents

LaunchDarkly

Feature flags

Linear

2-way ticket sync

Jira

2-way ticket sync

Azure DevOps

Work item sync

Asana

Project & tasks

GitHub

Code & patterns

Figma

Design context

Salesforce

Accounts & deals

HubSpot

CRM & tickets

Zendesk

Support tickets

Intercom

Customer data

Amplitude

Product analytics

PostHog

Analytics & flags

Mixpanel

Funnels & cohorts

Gong

Call transcripts

Granola

Meeting notes

Canny

Feature voting

Productboard

Feature requests

Notion

Docs & wikis

Confluence

Wiki & docs

Slack

Decisions & threads

Google Workspace

Docs, Sheets, GA

Datadog

Metrics & alerts

Sentry

Error tracking

PagerDuty

Incidents

LaunchDarkly

Feature flags

Keep your tools. Add intelligence. Vantage doesn't replace Notion, Linear, or Slack — it connects them.

+ Aha!, Typeform, FullStory, Hotjar, Freshdesk, Monday.com, Trello, Shortcut, and 48 total integrations

From our founding users

What PMs are saying.

“

I spent half my week keeping docs, tickets, and Slack threads in sync after every scope change. With Vantage, scope changes rebuild everything. I review a diff and commit. My week back.

Saved ~10 hrs/week

TS

Tarak Sawant

Product · Quantiphi

“

Compliance alone would have saved my biggest project this year. Vantage flagged a GDPR gap before we wrote a line of code. I'd pay for this personally even if my org doesn't adopt it.

Compliance gaps caught pre-build

K

Khushboo

Product · Dhan · Fintech

“

Conflicts between our parallel products were only discovered after engineering shipped. By then it cost sprints, not hours. Vantage catches that at the requirements stage now.

Cross-project conflicts caught early

OP

Om Pancholi

Product · The Sleep Company

“

The generated PRD is one of the best I've seen in the business. It's crisp, not too long, to the point and got everything right.

PRD quality validated

N

Nikhil

Product · India Today

“

I spent half my week keeping docs, tickets, and Slack threads in sync after every scope change. With Vantage, scope changes rebuild everything. I review a diff and commit. My week back.

Saved ~10 hrs/week

TS

Tarak Sawant

Product · Quantiphi

“

Compliance alone would have saved my biggest project this year. Vantage flagged a GDPR gap before we wrote a line of code. I'd pay for this personally even if my org doesn't adopt it.

Compliance gaps caught pre-build

K

Khushboo

Product · Dhan · Fintech

“

Conflicts between our parallel products were only discovered after engineering shipped. By then it cost sprints, not hours. Vantage catches that at the requirements stage now.

Cross-project conflicts caught early

OP

Om Pancholi

Product · The Sleep Company

“

The generated PRD is one of the best I've seen in the business. It's crisp, not too long, to the point and got everything right.

PRD quality validated

N

Nikhil

Product · India Today

Built for trust.

Enterprise-grade security so you can connect your tools with confidence.

Encrypted in transit

All connections use TLS. Your data is encrypted between your browser, our servers, and our database. Every action is logged.

No model training

We never train on your data. The AI services that process your data are contractually barred from training on it.

Your data, your control

Disconnect any integration or close your account at any time. We remove it from active systems within 30 days.

Pursuing SOC 2 Type II and GDPR compliance. Enterprise security reviews available on request.

Pricing

Start free. Upgrade when you’re shipping.

Unlimited projects on every plan. AI work runs on credits, so you only pay for what you use.

Save over 20%
Free

$0

Try PRDs, journeys and tickets on your real work.

300 credits to start

Start free
  • Unlimited projects
  • PRDs, user journeys and tickets
  • Feedback inbox, themes and scoring
  • Morning briefing and conflict detection
  • Public roadmap, changelog and feedback portal
  • Share docs with your team by link
  • 2 connected tools
  • Prototypes on Pro
  • Linear sync on Pro
Most popular
Pro

$19/seat/mo

For the PM shipping every week.

1,500 credits / month

Get Pro
  • Everything in Free
  • Unlimited questions and documentsfair use
  • Prototypes
  • Unlimited connected tools
  • Linear two-way sync
  • Use Vantage from Claude and ChatGPT
  • Custom domain, no Vantage branding
  • Routines
  • 2 viewer seats
Business

$59/seat/mo

For product teams working from one source of truth.

4,000 credits / seat / month

Added up into one team balance: 5 seats = 20,000 a month.

Get Business
  • Everything in Pro, plus:
  • Unlimited PRDs, journeys and ticketsfair use
  • Unlimited viewers for eng, design and leadership
  • Shared workspaces with team memory
  • Conflicts caught across teams
  • Leader reports on what shipped
  • Our most capable AI models and higher-fidelity prototypes
  • Priority processing for faster generations
  • Roles, admin controls and per-user credit limits
  • Dedicated support
Enterprise

Custom

For organizations with several product teams.

Custom credit pool

Talk to founders
  • Everything in Business
  • Multiple organizations
  • SSO (Google Workspace / SAML)
  • Audit log export
  • SLA and security reviews

Free needs no credit card. Paid plans can add 500 credits for $10 at any time.

FAQ

Questions before you start.

Comparing tools? See Vantage vs Productboard, ChatPRD and Notion AI.

Stop being the sync layer.

Connect your tools. See what you've been missing by tomorrow morning.

The Vantage story

From a changed plan to a shared direction. 90 seconds.

Watch on YouTube

Know where things stand. Decide where they go.

Get started free