What Is Vantage?
Vantage is the AI-native PM workspace. It connects every product decision to the data that drove it - across analytics platforms (Amplitude, Google Analytics), engineering tools (Linear, Jira, GitHub), design tools (Figma), communication (Slack), and documentation (Notion). It then generates PRDs, prototypes, user journeys, and tickets grounded in that connected context.
Unlike traditional product management tools that store static documents, Vantage maintains a connected product intelligence that traces every deliverable back to the analytics, conversations, and research that informed it. When source data changes (an analytics metric shifts, a Slack discussion invalidates a requirement, a Figma design changes), Vantage rebuilds every connected deliverable. You review the changes, accept or reject them, and approve. Nothing updates silently.
Pricing starts at $0 (free tier with 1 active project, 20 queries/month, 3 documents). Pro is $19/seat/month. Business is $59/seat/month with compliance checking, conflict detection, and SSO/SAML. Enterprise pricing is custom with on-premises deployment options.
Core Concepts
Connected Intelligence
The foundation of Vantage. Every product deliverable - PRD, ticket, prototype, user journey - links to the sources that informed it. This means every line in a spec traces back to a specific Slack thread, Amplitude funnel, or GitHub PR. When any source changes, every connected deliverable knows.
Grounded Generation
When Vantage generates a PRD, prototype, or ticket, every claim traces to a connected data source. There are no hallucinated requirements - every output includes citations to the analytics, conversations, and research it drew from.
Automatic Rebuilds
When reality changes - an analytics metric drops, a Slack conversation shifts direction, a Figma design is updated - you add the new context and trigger a rebuild. Vantage rebuilds every connected deliverable and shows you exactly what changed. You review, accept or reject each change, and approve.
Two-Way Ticket Sync
Vantage syncs bidirectionally with Linear and Jira. Generate tickets from requirements with pre-filled fields. When ticket status changes in Linear, Vantage knows. When requirements change in Vantage, connected tickets update. Conflict detection flags when two tickets across projects address the same requirement differently.
Compliance Checking
Before code is written, Vantage checks requirements against GDPR, HIPAA, SOC2, CCPA, PCI-DSS, and WCAG standards, plus any custom compliance rules you define. It surfaces advisory risks for legal and security teams to review, catching compliance gaps at the requirements stage rather than after launch.
Self-Learning Memory
Vantage learns how your team works with each project. By the third project, it already knows your team's conventions, priorities, and patterns. No configuration required. Every project makes the next one smarter.
Grooming Sessions
Run ticket review sessions with your engineering lead inside Vantage. Adjust scope on items and watch dependencies update in real time. No more updating spreadsheets after the call.
What Vantage Generates
PRDs & Specs
Grounded documents where every line traces to a data source
Clickable Prototypes
Multiple variants in parallel with public feedback links. Compare options side by side.
User Journeys
Three formats from the same context: mind map, swimlane, and screen flow
Linear/Jira Tickets
Pre-filled from requirements with two-way sync
Sourced Answers
Query engine that answers questions from your connected data
Compliance Reports
Advisory checks against GDPR, HIPAA, SOC2, CCPA, PCI-DSS, WCAG, and custom rules
Analytics Dashboards
Charts tied to active requirements, not vanity metrics. Share a link instead of building a slide deck.
Grooming Reports
Real-time collaborative ticket review with live dependency updates
Integrations
Slack
Thread ingestion, decision extraction
Linear
Two-way ticket sync
Jira
Two-way ticket sync
Figma
Design context
GitHub
Code context, PR linking
Amplitude
Product analytics
Google Analytics
Traffic and conversion data
Notion
Doc import
Google Workspace
Docs, Sheets, Slides
Pricing
Free
$0
- • 1 active project
- • 20 queries/month
- • 3 documents
Pro
$19/seat/mo
- • 10 active projects
- • 150 queries/month
- • 10 documents/month
Business
$59/seat/mo
- • Unlimited projects
- • Compliance checks
- • SSO/SAML
Enterprise
Custom
- • On-prem option
- • Dedicated support
- • SLA & audit logs
Frequently asked questions
Try Vantage for free
Connect your tools, ask a question, ship the answer. No credit card required.
Have a feature in mind? Describe it and Vantage drafts the PRD.
A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.
How this works
- We save what you typed. No AI runs on this page.
- You create a free account.
- Vantage builds a PRD from it inside your own workspace.
Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.
Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy
Free to start. No credit card required.