Automatically capture decisions, extract requirements, and generate Linear/Jira tickets. Stop losing critical context to fast-moving chat threads.
Let's go with the Stripe referral system instead of building it from scratch. It saves us three weeks of custom ledger development.
Agreed. I will create a ticket VAN-102 for the Stripe integration and link it to the billing docs. Sarthak, can you update the requirements spec?
Use Stripe Referral System
Decided by Sarthak Agarwal, Shivansh Srivastava. Saves 3 weeks of custom ledger dev.
Stripe Referral Integration
How vantageOS keeps your product spec and team discussions connected.
Connect your Slack workspace securely via OAuth. We support both bot and user-level tokens.
Choose which public and private channels to sync. No bot invite required when using user authentication.
Vantage structures discussions into decisions, updates PRDs, and syncs issues back to Linear or Jira.
We don't just dump message logs. We build an interactive product intelligence.
Our system filters out the noise. It detects phrases like "we decided" or "agreed on", and groups unanswered product questions that might block your engineers.
Vantage automatically extracts Jira keys, GitHub repository URLs, and Notion page links mentioned in any Slack chat, stitching them into your project graph.
User-level scopes are requested alongside bot permissions. This means vantageOS can sync any channel the authorizing user has access to without force-inviting the bot user.
By resolving Slack profile emails, vantageOS links Slack usernames to corresponding GitHub committers and Jira assignees for complete project accountability.
Your conversations are private. We build safeguards to keep them that way.
We do not use customer data or Slack logs to train AI models. Your intellectual property is safe.
All data transferred between Slack and vantageOS is encrypted using TLS 1.2+ and stored securely using AES-256.
We align with GDPR, HIPAA, and SOC2 security guidelines to manage workspace access roles rigorously.
Connect your Slack workspace and let Vantage capture decisions and sync tickets automatically.
Free to start. No credit card required.