Product workflows2026-11-053 min read

Capture Feedback by Email in Productboard

Forward customer email to the workspace’s unique Productboard address. Productboard attributes the feedback to the original sender and assigns the forwarding user as note owner.

Before you start: Ask a Maker to locate the integration address. Check whether forwarded threads contain sensitive material that should not be collected.

Worked example: A support colleague forwards a request for scheduled exports. The desired result is a note attributed to the customer, with the colleague responsible for follow-up.

Step-by-step guide

01

Locate the destination

Open Main menu → Settings → Integrations → Email. Copy the generated workspace address rather than inventing an alias at Productboard.

02

Save a clear contact

Add that address to your email contacts with the workspace name. Keep personal aliases in your email client; the Productboard address itself is not customizable.

03

Forward one request

Use a representative email with the original sender information. Remove unrelated quoted material before sending.

04

Check the resulting note

Open the new feedback item on an insights board. Verify customer attribution, owner, content and any relevant attached image.

05

Expand routing carefully

Use Add integration if you need another address with its own tags. For Gmail forwarding setup, complete the confirmation link that arrives as a Productboard note.

Common mistakes

Enabling broad forwarding without a sample

First check attribution and content. A mail rule can otherwise fill the research repository with unrelated conversations.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Try it free, no sign-up

Before you set this up, check what customers are actually asking for.

Paste call notes, support tickets or feedback. Vantage pulls out the signals and themes in about 30 seconds.

Free to start. No credit card required.

Related reading