Product workflows2026-11-073 min read

Configure Fibery Entity Permissions

Open the entity, use Share, choose the person and access level, and Invite. This grants access to that item without automatically showing its parent Space.

Before you start: Have permission to share at the requested level. Groups and advanced access-extension templates require Pro or Enterprise.

Worked example: A designer needs to comment on one Feature, while a PM edits it. Give the designer Commenter and keep customer interview records outside the grant unless the review needs them.

Step-by-step guide

01

Choose the boundary

Open the exact Feature being reviewed. Identify whether the reviewer needs only the item or also related stories and evidence.

02

Set the direct grant

Click Share at the top right, enter the person, choose Commenter, and click Invite. Do not give Editor just to permit feedback.

03

Inspect linked content

Check whether related entities have been included through access extension. Share only the context needed for this review.

04

Verify the receiving experience

Ask the designer to open the item from Shared with Me. A direct entity grant does not automatically add the parent Space to their sidebar.

05

Review existing stronger access

If the designer can edit despite the Commenter grant, inspect Space/database and other grants. A lower direct role does not neutralize stronger access elsewhere.

Common mistakes

Treating a record grant as a full workspace invitation

An entity grant has a narrower purpose. Verify navigation and evidence access from the recipient’s perspective.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Start the PRD

Have a feature in mind? Describe it and Vantage drafts the PRD.

A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading