Connect Jira Delivery Data to Fibery
Install the Jira integration, sync issues, and connect them to Features using an explicit identifier. Reading delivery data does not require enabling two-way writes.
Before you start: Have Fibery integration configuration access and Jira project administration for adding a custom field. Confirm integration limits and which Jira projects are in scope.
Worked example: Jira issue ONB-42 implements Fibery Feature 17. A plain-text Feature ID value of 17 gives an inspectable match; similar titles alone are too ambiguous.
Step-by-step guide
Create the integration Space
Open Templates at the bottom of the sidebar, choose Jira and click Sync. Complete authentication for the intended Jira source.
Add the link key in Jira
Create a Short Text, plain-text custom field named Feature ID on the relevant issue type. Set the selected issue to the Feature’s ID.
Refresh the imported record
Open the Jira Space settings in Fibery and use Sync Now. Confirm ONB-42 contains the expected identifier.
Create the Feature relation
On Feature add a Relation to the synced Issue database. In the relation settings turn on Automatically link, compare the Issue-side Feature ID text field with Feature’s Public ID text field, leave the operator as equals, and save. Use the displayed public identifier (17 in this example), not the internal UUID. Confirm the two values match exactly.
Check before expanding scope
Verify status and assignee on ONB-42 and a deliberately nonmatching issue. Keep write-back disabled until the team agrees which fields Fibery should change.
Common mistakes
Using the wrong Jira custom field type
The documented link-key workflow requires Short Text. A different field type can break matching.
Assuming all fields write back
The two-way sync supports selected built-in and custom types. Other imported fields remain read-only.
Sources and verification
Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.