How-To2026-11-062 min read

Create a Plane Module for Feature-Level Scope

Create a Plane module to group related work within a project, independently of the cycle in which each item is delivered. Modules can have their own dates, lead and progress.

A Project Admin enables Modules in project settings. Contributors can create modules, while guests cannot access them. Installed self-hosted versions should expose the current module controls before using this workflow.

Example: a Tablet layouts module can hold design and implementation work delivered across several cycles without changing its feature-level scope.

Step-by-step guide

01

Enable the project feature

Open project menu > Settings > Modules under Features and enable Modules if necessary. Return to the Modules page in that project’s sidebar.

02

Create the module record

Click Add Module, enter a unique title and describe the intended result. Choose a state and both dates when a schedule is known, then create the module.

03

Set accountable participants

Select the module lead and members from the project. These fields describe responsibility and participation; they do not assign every work item or grant additional permissions.

04

Add the first scoped items

Open the module and create work or choose + > Add an existing work item. Inspect its progress panel and make sure the selected work actually belongs to the module’s goal.

Common mistakes

Expecting automatic module completion

Finishing all work items does not automatically change the module state. Review scope and set Completed intentionally.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Spec to tickets

Working in Plane? Turn your spec into dependency-ordered tickets.

Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.

0 / 8,000

Where do your tickets live? (optional)

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading