Product workflows2026-11-052 min read

How to create content properties report in Confluence

Build a Confluence content properties report by putting a key/value table inside Content properties on each source page, then reporting on their shared label.

This is the native Cloud workflow formerly called Page properties report. For example, collect Owner, Review date and Decision from release reviews without manually maintaining a second summary table.

Step-by-step guide

01

Standardize one source table

On each release-review page, insert Content properties and create a two-column table inside its body. Put Owner, Review date and Decision in the left column and their values in the right. Use identical key spelling so the report produces consistent columns.

02

Label the source pages

Give every source page the same label, such as release-review. If each page contains several properties blocks, assign the relevant block an ID such as launch-summary. The label finds pages; the optional ID selects which block to report.

03

Insert and scope the report

On the overview page, type /contentpropertiesreport. Enter release-review in Labels and, if used, launch-summary as the properties ID under Options. Add a space or ancestor filter when the label is shared beyond the intended branch.

04

Check the report against two examples

Publish the overview and compare two rows with their original pages. An empty row or missing column should trigger a check of labels, table placement, matching keys and optional ID. Change one source value and verify that the overview reflects the source.

Common mistakes

Building an ordinary table outside the macro

The report extracts structured content properties, not arbitrary tables that happen to use the same headings.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Start the PRD

Have a feature in mind? Describe it and Vantage drafts the PRD.

A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading