How to Create a Product Changelog in Linear
Linear includes a native Changelog feature under each team and project. It lets PMs write, draft, and publish changelog entries directly alongside the issues being shipped — without switching to a separate doc tool. The changelog is linked to the release work, making it easy to keep entries accurate.
This guide covers how to use Linear's Changelog feature to build a consistent release communication habit.
Working in Linear? Turn your spec into dependency-ordered tickets.
Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.
How this works
- We save what you typed. No AI runs on this page.
- You create a free account.
- Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.
Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.
Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy
Step-by-step guide
Access the Changelog feature
In your Linear team, navigate to Changelog in the left sidebar. If you do not see it, enable it in Team Settings > Features. Linear's changelog is organized by date, with the most recent entries at the top. Each entry supports rich text, images, and video embeds.
Create entries tied to releases
When a significant feature ships, create a new changelog entry. Click "+ New Entry" and write a title like "v2.4 — Search improvements." Link the entry to the relevant Linear Project or Issues by referencing issue IDs (e.g., ENG-145). This creates a traceable connection from changelog to shipped work.
Write user-focused entries
Lead each entry with the user benefit: what can users do now that they could not do before? Use bullet points for multiple changes. Keep entries under 200 words for features; longer entries lose readers. Embed a screenshot or GIF to show the change in context.
Use Draft and Published states
Linear changelog entries have Draft and Published states. Write drafts during development so the content is ready before launch. Schedule publication to coincide with the release. Published entries appear in your team's changelog feed and can be shared via URL.
Share changelog entries with stakeholders
Each Linear changelog entry has a shareable URL. Post the link to #product-announcements in Slack on release day. Pin the URL in your team's Linear project for reference. Forward the link to customer success for customer communication. The URL is readable without a Linear account.
Common mistakes
Writing changelogs only for engineers
Linear changelogs live near the engineering workflow, so it is easy to write technically. Keep the language user-facing. If an engineer writes "optimized Redis cache TTL," the PM should edit it to "pages load significantly faster."
Not keeping drafts updated during development
The best time to write a changelog entry is when the feature is being built. The PM knows the "why," the engineer knows the "what." A draft started in development requires only a polish pass at launch — not a reconstruction from memory.
Publishing without screenshots
Text-only changelogs are skimmed and forgotten. A screenshot or GIF showing the new feature in context communicates the change in seconds. Linear changelog entries support image embeds — use them.
Tips
Subscribe to your team's changelog feed to receive notifications when new entries are published
Use Linear's changelog as a source of truth for your customer-facing release notes on your website
Reference changelog entry URLs in Linear issue comments to connect shipped work to announcements
How Vantage helps
Vantage pushes tickets to Linear with full PRD context. When a feature ships and you write a Linear changelog entry, the original PRD requirements are accessible through the Vantage link on each ticket — giving you the "why we built this" context needed for accurate changelog writing.