Product workflows2026-10-262 min read

Target PostHog Surveys to Relevant Users

Show the survey when an eligible user has enough context to answer, then test both inclusion and exclusion. The targeting rule should reflect the research question rather than merely maximize response volume.

Before you start: Have a survey draft, supported SDK and an eligibility definition. Check available URL, event and property targeting for the current implementation.

Worked example: Ask about export usefulness after a successful export, not immediately after signup. Keep users who cannot access export outside the audience.

Step-by-step guide

01

Define the research audience

Write which users can answer meaningfully and which cannot. Include plan, role and recent product experience where relevant.

02

Choose a useful moment

Select a trigger that follows the experience being evaluated. Avoid interrupting an unfinished high-stakes action merely because the page is easy to target.

03

Configure supported conditions

Use documented URL, event or property rules. Verify whether a proposed cohort or flag condition is supported before promising behavioral targeting.

04

Test boundary cases

Use a qualifying user, a non-qualifying user and a person who already responded. Confirm timing and repeat behavior match the intended experience.

05

Review interruption cost

Check small screens, keyboard behavior and interaction with other surveys. Reduce frequency or move the prompt when it blocks the task.

06

Launch with a monitoring plan

Record the audience and rule version. Watch display, dismissal and response behavior, then interpret answers as feedback from that selected audience.

Common mistakes

Ask before experience

A new user cannot evaluate a feature they have not used.

Broad URL match

A route pattern can include unrelated pages. Test real URLs and navigation.

Responses treated as representative

Targeting and voluntary participation select the sample. State who was asked.

Tips

Write an exclusion case before launching.

Keep the prompt away from a critical submission moment.

Save the targeting version with the response readout.

Sources and verification

Based on product documentation checked on 2026-10-24. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Try it free, no sign-up

Before you set this up, check what customers are actually asking for.

Paste call notes, support tickets or feedback. Vantage pulls out the signals and themes in about 30 seconds.

Free to start. No credit card required.

Related reading