How-To2026-11-062 min read

Create Plane Work Item Types for Bugs and Requests

Enable Plane Work Item Types and add named types under Project settings > Work item Types. Types control which custom properties appear on the work item.

This is documented as a Pro feature and requires Project Admin access. Enabling Types is irreversible. Enterprise Grid can manage types at workspace level; self-hosted availability depends on edition and version.

Example: create Bug with environment and reproduction context while leaving routine engineering work as Task, rather than forcing every work item into a large bug form.

Step-by-step guide

01

Check the configuration scope

Open the project menu > Settings > Work item Types. For an Enterprise Grid governed workspace, ask its administrator to use the workspace-level type configuration.

02

Enable Types intentionally

Read and confirm the irreversible enablement prompt. Plane creates Task and Epic types automatically; inspect them before introducing another overlapping category.

03

Create the specific type

Click Add Work item Type. Enter Bug, explain when it applies, choose an icon and background color, and create it. Turn its active toggle on so creators can select it.

04

Create a representative Bug

Open the new work-item form, select Bug at the top left and inspect its properties. Save a real example and verify its icon and type are visible on the resulting item.

Common mistakes

Expecting to disable the whole feature

Once enabled, Work Item Types cannot be turned off for the project. Individual types can be disabled instead.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Spec to tickets

Working in Plane? Turn your spec into dependency-ordered tickets.

Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.

0 / 8,000

Where do your tickets live? (optional)

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading