How-To2026-10-282 min read

Export Project Issues from Linear

Filter issues to the project and export that view as CSV. A row export supports analysis, but it is not a full-fidelity project backup with every linked document and conversation.

Step-by-step guide

01

Check access and scope

Check project access and export role. Guests cannot export issues; view exports have different limits from authorized workspace exports.

02

Clear unrelated filters

Open a project issue view and clear unrelated filters.

03

Review the defined CSV fields

Issue CSV exports use a documented field set, not the columns displayed in your view. Remove unwanted spreadsheet columns after downloading a copy.

  • Worked example: Keep ID, Title, Status, Assignee, Estimate and Project Milestone for a delivery review. Maintain a separate index of specifications and other linked resources.
04

Export the view

From the project issue view, use Export issues as CSV in the project menu or command menu. Count the intended issues first and check the role-specific limit described below.

05

Inspect sample rows

Inspect the file for scope, row count, dates and empty fields.

06

Record snapshot context

Store the snapshot with export time, project link and review purpose.

07

Verify the result

Reconcile the exported row count with the intended issue set, then compare representative rows against Linear, including deliberately included completed or archived work.

Common mistakes

Avoid the main failure mode

CSV data is a snapshot. Editing the spreadsheet does not automatically update Linear or preserve a change history.

Check the handoff edge case

Exporting a filtered subset without recording the filter makes later comparisons misleading. Include the scope and snapshot time.

Sources and verification

Based on product documentation checked on 2026-10-24. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Spec to tickets

Working in Linear? Turn your spec into dependency-ordered tickets.

Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.

0 / 8,000

Where do your tickets live? (optional)

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading