How-To2026-11-092 min read

Filter Plane Work Items with PQL Queries

Switch Plane’s filter bar to PQL to combine precise work-item conditions. The editor suggests fields, operators and values as you build the query.

PQL is documented as Pro functionality. Verify it exists on your Cloud plan or licensed self-hosted edition. You need access to the project work being queried.

Example: priority = High AND hasNoAssignee() finds high-priority work without an owner, giving triage a specific queue to resolve.

Step-by-step guide

01

Open PQL in the target scope

Open the project work-item list and click PQL in the filter bar. Confirm the project scope before interpreting a small result set as a workspace-wide finding.

02

Build the first condition

Select Priority from the suggestions, choose the equality operator and High. Let the editor resolve supported values instead of guessing field names or capitalization.

03

Add the ownership condition

Append AND hasNoAssignee(). Inspect representative results and confirm they are high-priority items whose Assignees property is actually empty.

04

Save a reusable review view

Use Save view for the useful filter. Name it High priority unassigned and reopen it later to confirm the query persists while results change with live work.

Common mistakes

Blindly accepting an AI-generated query

If Plane AI creates the filter, inspect its actual PQL and sample matches. The natural-language request may resolve to a different scope than intended.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Spec to tickets

Working in Plane? Turn your spec into dependency-ordered tickets.

Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.

0 / 8,000

Where do your tickets live? (optional)

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading