Product workflows2026-11-093 min read

Import Feedback Notes into Productboard

On an insights board, use the blue plus menu → Import feedback, download the template and map your source data to the supported headers.

Before you start: Have permission to add feedback and a small export to validate first. Preserve the original customer’s identity separately from the teammate who collected it.

Worked example: Import an interview summary with note_title, note_text, person_email, company_name and created_at. The PM’s email belongs in owner_email, not person_email.

Step-by-step guide

01

Use the live template

Open Import feedback and download its CSV or Excel example. Copy those supported headers rather than translating column names by guesswork.

02

Populate source fields

Fill note_text, the required field. Add a useful title and the customer’s name/email and company details where available.

03

Set provenance deliberately

Use owner_email for an eligible workspace colleague. Format created_at as YYYY-MM-DD or YYYY-MM-DD hh:mm:ss to retain the original timestamp.

04

Review a small upload

Save UTF-8 CSV or XLSX, then drop it into the importer or Browse. Inspect the preview for broken columns and missing customer attribution.

05

Import and sample the results

Click Import X feedback. Open a few resulting items and verify text, customer, owner and date before importing the larger archive.

Common mistakes

Losing the historical date

Invalid or blank created_at defaults to the current date. That can make an old interview look like fresh demand.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Try it free, no sign-up

Before you set this up, check what customers are actually asking for.

Paste call notes, support tickets or feedback. Vantage pulls out the signals and themes in about 30 seconds.

Free to start. No credit card required.

Related reading