Product workflows2026-11-082 min read

How to include a page in another page in Confluence

Embed a whole Confluence page in another using the Include content macro and selecting the source in Content to Include.

The destination shows the source content rather than creating an independent editable copy. Use this for a shared operating procedure; use an excerpt when only one section belongs on the destination.

Step-by-step guide

01

Choose a self-contained source

Identify the procedure page and check its permissions. Everyone reading the destination also needs View access to the source. For example, an internal escalation procedure will not become visible to a guest merely because it is embedded in their project page.

02

Insert Include content

Edit the destination, type / and find Include content. Set Content to Include by searching for the procedure title. For another space, a reference such as OPS:Escalation procedure identifies the source; space keys are case sensitive.

03

Publish a useful surrounding explanation

Explain why the procedure is present and who maintains it rather than adding another copy of its instructions outside the macro. Publish the destination and compare it with the source to check that the complete procedure is the one intended.

04

Test access and future changes

Ask a representative reader to open the destination and inspect the embedded procedure. If it is unavailable, check source and destination View permissions separately. Maintain the procedure on its original page so other destinations continue to use the same wording.

Common mistakes

Assuming embedding grants source access

Include content preserves the source’s permission requirement. Fix access intentionally rather than making the source public to hide an error.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Start the PRD

Have a feature in mind? Describe it and Vantage drafts the PRD.

A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading