Product workflows2026-11-073 min read

Link Fibery Feedback to Features

For passage-level evidence, select text in a Rich Text field and link it to a Feature. Use a database relation when the whole feedback record belongs to a feature.

Before you start: Have a feedback record with Rich Text and an existing Feature database. Confirm the reader can access the underlying source, not only its title.

Worked example: An interview says the invite email is confusing and workspace roles are unclear. Highlight the sentence about the email for Invite email clarity; retain the separate roles observation as its own evidence.

Step-by-step guide

01

Open the source record

Read the full interview or support note first. Identify the sentence that supports a specific feature, preserving the surrounding qualification.

02

Select the evidence passage

Highlight that sentence in Rich Text. Use Cmd+L to link the selected words to an existing entity.

03

Choose the intended Feature

Select Invite email clarity, checking its description before linking. Avoid creating a second feature merely because the customer used different wording.

04

Keep the other need distinct

Link the roles passage separately if it supports another Feature. Do not attach the whole transcript as if every sentence supported both ideas.

05

Check the evidence trail

Open the linked Feature and inspect its reference back to the source. Ask a reader with normal access to follow it.

Common mistakes

Treating a mention as a structured relation

A textual evidence link and a relation field serve different purposes. Use the latter when you need schema-based collections or calculations.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Try it free, no sign-up

Before you set this up, check what customers are actually asking for.

Paste call notes, support tickets or feedback. Vantage pulls out the signals and themes in about 30 seconds.

Free to start. No credit card required.

Related reading