Product workflows2026-11-092 min read

How to list child pages with a macro in Confluence

Add a dynamic child-page list with Confluence’s Child items macro, selecting a parent and the depth to display.

Current Cloud naming includes folders and other nested content, not only pages. For a launch hub, list direct workstreams first and reveal deeper checklists only when readers need that detail.

Step-by-step guide

01

Pick the navigation boundary

Choose the parent whose children should appear. For example, use the “Autumn launch” hub rather than the space root so readers see launch workstreams instead of every product document. Check that the expected child items actually sit under that parent.

02

Insert the native macro

Edit the hub and type /childitems. The initial list uses the current page as its parent. Select the macro and its Edit icon to set another Parent item through the configuration panel if necessary.

03

Set depth and presentation

Keep Show all levels off for direct children, or choose a limited number of levels. Use Title sorting for a predictable alphabetical directory or Content tree to respect the sidebar’s curated order. Choose previews only when they help readers distinguish similar titles.

04

Verify as a reader

Publish and inspect the list with a representative user. It dynamically reflects added children and changed titles, but each reader sees only items they can view. A missing restricted child can be correct behavior, not a broken macro.

Common mistakes

Exposing the full tree unnecessarily

A deep list can overwhelm the hub. Prefer a deliberate depth and let readers open a workstream for its detailed navigation.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Start the PRD

Have a feature in mind? Describe it and Vantage drafts the PRD.

A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading