How-To2026-11-082 min read

Find and Restore Archived Plane Work Items

Open the project’s Archives to read finished work, then use Restore on an archived item when it needs to rejoin active tracking. Archiving preserves its properties and history.

Use a Project Admin or Contributor account to restore and edit tracked work. Only Completed or Cancelled work can be archived; current controls may differ on older self-hosted releases.

Example: restore an archived checkout bug before adding a follow-up finding, retaining the earlier discussion and original identifier instead of creating a duplicate.

Step-by-step guide

01

Find the project archive

Open the menu beside the project name and choose Archives, or press G then R in the project. Use the Work items tab to locate the original record.

02

Review the historical record

Open the archived item and read its description, comments and activity. Check that this is the same problem and not merely a similarly named earlier incident.

03

Restore before editing

Use the item’s upper-right menu and select Restore. Archived items are read-only, so restore the record before adding comments or changing its workflow state.

04

Resume deliberate tracking

Find the restored item in the project’s active work and set its state, owner and dates for the current investigation. Confirm its earlier properties and history remain available.

Common mistakes

Deleting to remove archive clutter

Delete is permanent and also removes sub-work items and attachments. Keep the archive when historical evidence may be needed.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Spec to tickets

Working in Plane? Turn your spec into dependency-ordered tickets.

Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.

0 / 8,000

Where do your tickets live? (optional)

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading