How to Manage Sprints in Asana (Step-by-Step)
Asana is not designed as a native sprint tool the way Jira is, but it provides enough flexibility to run effective sprints using portfolios, custom fields, timeline views, and saved filters. Many product teams prefer Asana's cleaner interface over Jira's complexity, and with the right setup, Asana handles agile sprint workflows well.
This guide covers sprint setup in Asana from first-sprint configuration through recurring sprint ceremonies.
Step-by-step guide
Create a Sprint project or use custom fields
Option A: Create a dedicated "Sprint [number]" project each sprint and move relevant tasks into it from the backlog. Option B: Add a "Sprint" dropdown custom field to your main project and filter by sprint number. Option A gives cleaner separation; Option B avoids task duplication. Most teams prefer Option B for simplicity.
Set up the sprint custom field
In your project, go to Customize > Add Custom Field > Dropdown. Name it "Sprint" and add values like "Sprint 1," "Sprint 2," etc. Add an "Effort" field (number) for story point equivalents. These fields allow filtering the board to show only current sprint tasks.
Run sprint planning
Two days before the sprint starts, filter the backlog to unassigned tasks sorted by priority. As a team, select tasks that fit within the team's capacity (use effort points total from previous sprints as your velocity baseline). Assign the Sprint field value on selected tasks and assign team members.
Configure the sprint board view
Switch to Board view and create a saved filter for "Sprint = [current sprint]." This filter becomes the team's daily standup board. Save this filtered view as a Saved View so the team can access it without recreating the filter each session.
Run daily standups with the board
Use the filtered board view during standups. Each team member updates their tasks' sections (To Do, In Progress, In Review, Done) before the standup. During the call, scan the board for blockers (tasks that have been In Progress for multiple days) and tasks that need reassignment.
Track sprint progress with a dashboard
Create an Asana Dashboard in the project: Project header > Dashboard > Add chart. Create a chart showing "Tasks by Section" filtered to the current sprint. This gives a burn-down equivalent showing tasks remaining in To Do and In Progress versus tasks in Done.
Run the sprint retrospective
At sprint end, use an Asana task with subtasks as a retro doc: subtasks for "What went well," "What needs improvement," and "Action items." Assign action items to owners with due dates. Archive this task after the retro so it is preserved but out of the active view.
Common mistakes
Not committing to a sprint capacity
Without a velocity baseline, sprint planning becomes "let's put everything in." Track effort points from completed sprints and use the average as the planning ceiling.
Adding tasks mid-sprint without removing others
Mid-sprint additions must be balanced by removals or the sprint scope inflates invisibly. When a new priority task is added, explicitly decide which task moves to the next sprint.
Skipping the retrospective
Sprint retros in Asana require discipline since the tool does not prompt for them. Block the last 30 minutes of every sprint on the calendar and use the same retrospective Asana task template each time.
Tips
Use Asana's "copy project" feature to create each new sprint project from a template with sections and rules pre-configured
Multi-home critical path tasks in both the sprint project and the epic project so progress updates in both places
Set up a weekly Asana digest for the PM showing all tasks due in the next 7 days
Use the Asana + Slack integration to post sprint progress updates automatically each Friday