Product workflows2026-11-053 min read

Organize Productboard Components and Features

Use Library → Products → Product hierarchy to add a Feature beneath the correct Product or Component. Use the Feature’s Hierarchy parent field when its location needs to change.

Before you start: Use a Maker or Admin account with editing access. Start with an existing Product and Component; this guide concerns organization, not a full feedback collection rollout.

Worked example: CSV export belongs under the Reporting Component of Atlas. Keeping one Feature there avoids separate copies under Support and Sales just because both teams requested it.

Step-by-step guide

01

Locate the intended parent

Open Main menu → Library → Products → Product hierarchy. Find Atlas and its Reporting Component before creating the idea.

02

Create the Feature

Hover the parent, choose Add under → Add feature, and enter CSV export. Click away when finished adding items.

03

Define its scope

Open the Feature Detail tab and describe what users can export and which formats are outside this idea. Keep the name specific enough to distinguish another export request.

04

Correct the location if needed

Use Hierarchy parent in the Feature sidebar to select Reporting. Search the full hierarchy when the recent suggestions do not show the intended parent.

05

Check the hierarchy and references

Find the Feature under its new parent and inspect linked evidence. Explain the placement to colleagues who previously searched in another area.

Common mistakes

Duplicating one need across departments

A Feature can collect evidence from several teams. Department-specific copies fragment the decision and demand history.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Try it free, no sign-up

Before you set this up, check what customers are actually asking for.

Paste call notes, support tickets or feedback. Vantage pulls out the signals and themes in about 30 seconds.

Free to start. No credit card required.

Related reading