How-To2026-10-302 min read

Organize Project Documents in Linear

Attach a concise set of documents and named external links to the project. Keeping an index in the overview helps readers find decisions without reading every issue.

Step-by-step guide

01

Check access and scope

Project access and permission to edit its resources are required. External documents retain their own access rules.

02

Inventory source documents

Inventory the current brief, designs, decision record and rollout plan.

03

Create a project document

Create a project document for information best maintained beside the work. In project Resources, use + and Create Document; give it a title that distinguishes current scope from a historical decision.

  • Worked example: Use Brief: invite-flow scope, Decision log: expiry rules, and Rollout: rollback owner. Put superseded alternatives in the decision record rather than presenting multiple competing current specifications.
04

Attach external references

Add external resources through the project Resources section. The same Resources control accepts external links; add a descriptive label instead of leaving only the source domain.

05

Label authoritative resources

Give links descriptive labels and state which document is authoritative.

06

Test reader access

Ask a reviewer to open every resource with their normal permissions.

07

Verify the result

A new collaborator can locate the approved scope and rollout instructions without asking the author.

Common mistakes

Avoid the main failure mode

A link does not grant permission to its destination. Avoid assuming a project member can open a private design file.

Check the handoff edge case

Adding resources without descriptive labels forces readers to open every link to discover which specification is current.

Sources and verification

Based on product documentation checked on 2026-10-24. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Spec to tickets

Working in Linear? Turn your spec into dependency-ordered tickets.

Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.

0 / 8,000

Where do your tickets live? (optional)

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading