Product workflows2026-11-063 min read

Publish a Changelog Entry in Canny

Use Changelog → Create a new entry, describe the shipped change, link relevant posts and review publication notifications. A release note should explain a usable change rather than announce an unshipped promise.

Before you start: Have permission to manage the changelog and verified release information. Email subscription notifications require the relevant Pro or Business capability.

Worked example: Announce that workspace owners can export the audit log. Explain where the control is and who can use it, then link the matching request instead of every loosely related reporting post.

Step-by-step guide

01

Gather release evidence

Confirm the feature is available to the stated audience. Record any role or plan limits and a support link before writing the announcement.

02

Create the entry

Open Changelog and choose Create a new entry. Lead with the user’s new capability, then explain the path to use it.

03

Link the right posts

Associate only the feedback posts addressed by this release. Check that their scope matches the change actually delivered.

04

Apply useful labels

Choose labels that help readers filter entries. Keep a correction distinct from a new capability instead of tagging everything alike.

05

Review and publish

Preview the text and images, then choose the Notify subscribers setting deliberately. Publish after checking the audience and the subscriber control.

Common mistakes

Assuming every voter is a changelog subscriber

Changelog subscription emails and post-status notifications are separate mechanisms. Link posts for context without claiming an automatic audience equivalence.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Try it free, no sign-up

Before you set this up, check what customers are actually asking for.

Paste call notes, support tickets or feedback. Vantage pulls out the signals and themes in about 30 seconds.

Free to start. No credit card required.

Related reading