Product workflows2026-11-092 min read

How to resolve inline review comments in Confluence

Resolve a Confluence inline comment from its original thread once the feedback has been addressed; use the comments panel’s Resolved filter to inspect or reopen it.

Resolution removes the highlight while keeping the discussion available. For a PRD review, first record the scope decision so the disappeared highlight does not hide an unresolved disagreement.

Step-by-step guide

01

Open the exact review thread

Select the highlighted text or use Show comments in the bottom-right floating action bar. Confirm the thread relates to the current wording and read its replies before editing. A general comment and an inline comment have different review behavior.

02

Address the feedback visibly

For example, if a reviewer asks whether refunds are in scope, update the PRD’s scope section and reply with the decision and reason. Publish the page edit when appropriate so readers see the actual resolution, not just an assertion in comments.

03

Resolve the original inline comment

Use the resolve option on the initial inline comment. The option is not attached to a reply. You can resolve while viewing or editing, and the associated text highlight disappears once the thread is resolved.

04

Check the resolved queue

In the comments panel, filter for Resolved and inspect the thread. If the scope decision changes, use the green Reopen check next to the comment. Review remaining open comments separately so a clean page does not imply the entire review is complete.

Common mistakes

Deleting the thread to clear a highlight

Deleted comments cannot be restored. Resolve a completed discussion when you need to preserve its review history.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Start the PRD

Have a feature in mind? Describe it and Vantage drafts the PRD.

A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading