Restore a Deleted Entity in Fibery

Find the deleted entity in Trash, select it and Restore. If its parent database was also deleted, restore that container before recovering the record.

Before you start: Use an account with the necessary data access and act within the plan’s retention window. Check what was deleted before recreating a replacement record.

Worked example: A Feature disappears after its database was accidentally deleted. Restoring only a new empty database with the same name is not the same as recovering the original container and Feature.

Step-by-step guide

01

Investigate the deletion

Open Activity near the bottom of the sidebar. Use the event and time filters to identify whether one record or its parent database was removed.

02

Open Trash

Find Trash at the bottom left and use its filters to locate the deleted entity. Check its identity rather than matching only the display name.

03

Recover the parent if needed

If the database was deleted too, restore it first using Activity or Trash. The entity needs a valid place to return to.

04

Restore the record

Select the deleted entity and click Restore. Wait for the restored item to become accessible before attempting a second recovery.

05

Inspect the recovered workflow

Open the entity and check its fields, relations and visibility. If the intended View is still missing, investigate that item separately with an Admin.

Common mistakes

Recreating instead of recovering

A new record with the same title may not restore the original links or history. Look for the original item first.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Start the PRD

Have a feature in mind? Describe it and Vantage drafts the PRD.

A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading