Product workflows2026-11-063 min read

Restrict Access to a Fibery Space

Use the Space Access page to grant the minimum role each collaborator needs, then inspect effective access. Space grants can include data as well as Views and documents.

Before you start: Use an account permitted to manage Space access. Excluding Space data from a grant or hiding data from Admins requires Pro or Enterprise.

Worked example: A roadmap reviewer should read a Product Space but should not reconfigure its databases. Give that colleague Viewer rather than Architect, then check whether group membership grants more.

Step-by-step guide

01

Inspect existing access

Expand the Space in the sidebar and open Access. Identify individual, group and Admin grants before changing anything.

02

Apply a suitable role

Add the intended person, choose Viewer for read access, and click Invite. Use stronger roles only for an explicit editing or configuration task.

03

Remove unintended grants

Review the existing rows for people and groups outside the audience. Consider other valid access paths before concluding a removed row fully revokes access.

04

Audit the result

Click Shared with … users in the top right. Expand the reviewer to inspect the grants that combine into their effective access.

05

Validate with the reviewer

Have them open a normal View and a source record. Confirm they can read the intended content and cannot perform the restricted configuration task.

Common mistakes

Assuming Admins disappear from the Space

Admins retain Architect access to structure. On supported plans, excluding data is a separate mechanism, with Space-level content caveats.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Start the PRD

Have a feature in mind? Describe it and Vantage drafts the PRD.

A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading