Product workflows2026-11-093 min read

Roll Up Customer Demand in Fibery

For distinct company demand, connect each Feature to requesting Companies and count that collection. Counting feedback records answers a different question.

Before you start: Have Feature and Company databases with a many-to-many relation named Companies on Feature. Use configuration access to add a Formula field.

Worked example: Northwind sends three notes and Bellwether sends one about CSV export. Link the two company records to the Feature: distinct company demand should be 2, while note volume is 4.

Step-by-step guide

01

Choose the counting unit

Decide whether planning needs companies, people or conversations. Write that unit into the field name so stakeholders do not compare incompatible totals.

02

Model the relationship

Add a many-to-many Relation from Feature to Company. Name the Feature-side collection Companies and link Northwind and Bellwether once each.

03

Create the count

Add a Formula field named Requesting company count. Enter Companies.Count() to count the directly related collection.

Companies.Count()
04

Check repeated feedback

Keep Northwind’s three notes as separate evidence if needed. Do not create three Northwind company records to represent three conversations.

05

Review traceability

Open each company from the collection and confirm the source evidence supports the Feature. Show the count beside the collection during planning.

Common mistakes

Calling note volume customer demand

A prolific customer can produce many notes. Keep conversation volume separate from the number of distinct requesting accounts.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Start the PRD

Have a feature in mind? Describe it and Vantage drafts the PRD.

A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading