Product workflows2026-10-272 min read

Run Problem Framing in Miro

Frame the obstacle for a specific audience in a specific context before debating solutions. A good frame makes room for alternatives while retaining enough evidence and consequence to guide work.

Before you start: Have authorized customer evidence, business context and an accountable owner. Keep the workshop focused on one decision area.

Worked example: We need an AI assistant is a solution. New owners cannot tell which teammates have permission to view a report is a problem that can be investigated and addressed in several ways.

Step-by-step guide

01

Gather the evidence

Bring concrete observations and their sources. Mark assumptions rather than allowing every stakeholder claim to become a fact.

02

Define the audience

State who encounters the obstacle and when. Avoid a universal user label that hides role differences.

03

Describe the obstacle

Write what prevents progress without naming a feature. Separate an observed symptom from a proposed underlying cause.

04

Explain consequence

Connect the obstacle to user and business outcomes. Distinguish measured impact from a plausible but unverified cost.

05

Challenge the boundary

Ask whether the frame is too broad, too narrow or already prescribes a solution. Preserve contradictory contexts.

06

Choose the discovery question

Save a bounded question, known evidence, uncertainty and owner. Use it to compare research or solution options next.

Common mistakes

Solution in disguise

Remove the preferred technology from the problem.

Everyone as audience

Role and context matter.

Unmeasured cost called fact

Label estimates and uncertainty.

Tips

Ask what the person is trying to accomplish.

Keep one contradictory observation visible.

Write an explicit out-of-scope boundary.

Sources and verification

Based on product documentation checked on 2026-10-24. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Start the PRD

Have a feature in mind? Describe it and Vantage drafts the PRD.

A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading