Product workflows2026-11-083 min read

Use a Consistent Effort Scale in Productboard

Use the numeric Effort field with a team-agreed unit. Productboard accepts numbers and offers Fibonacci choices from a zero-valued cell; this is not a custom t-shirt-scale configuration.

Before you start: Use editing access and agree with engineering whether the numbers represent points or another consistent unit. Check whether the item is using manual effort or a rollup.

Worked example: A Feature has two subfeatures estimated at 3 and 5 points. A rollup of 8 is useful, while manually setting the parent to 13 creates a separate estimate that no longer follows its children.

Step-by-step guide

01

Agree on the unit

Document the sizing convention before entering values. Keep story points and calendar days out of the same numeric comparison.

02

Expose Effort

On a grid use Add columns and enable Effort. Review a few parent and child items before bulk entry.

03

Enter the estimate

Click the Effort cell and type the value. Click again while zero to use the offered Fibonacci numbers when they fit your convention.

04

Inspect the calculation mode

Check the field icon or hover text. A rollup follows child values; entering a manual value changes that behavior.

05

Restore aggregation deliberately

If the parent should aggregate again, right-click its manual Effort field and switch back to rollup. Check the resulting value against the children.

Common mistakes

Overwriting a rollup without noticing

A manual edit stops automatic updates from children. Review the mode before treating an unchanged parent estimate as fresh data.

Sources and verification

Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Try it free, no sign-up

Before you set this up, check what customers are actually asking for.

Paste call notes, support tickets or feedback. Vantage pulls out the signals and themes in about 30 seconds.

Free to start. No credit card required.

Related reading