Review a Fibery Entity’s History
Use View Activity on the entity to review field changes. Use View History for Rich Text or Documents when the question concerns edited wording.
Before you start: Have access to the entity and check the retention window. Current plans provide different history lengths; older changes may be outside your workspace’s allowance.
Worked example: A Feature owner changed and its scope paragraph was shortened. These are two investigations: field activity explains the owner change, while text revisions show the earlier wording.
Step-by-step guide
Record the current state
Open the Feature and note the disputed field or passage. Avoid changing it again before you identify the relevant event.
Inspect field activity
Use View Activity in the top right. Review who changed the owner and when, scrolling through additional history pages where available.
Inspect text separately
For the scope paragraph, open the Rich Text field’s View History. Select a relevant revision and compare it with the current text.
Choose a narrow correction
For a wrong field change, inspect the activity row’s reversal action. For text, restore a selected version only when you intend to restore that version’s content.
Validate the result
Reopen the Feature, check the corrected value and explain the decision to collaborators. Keep the history trail meaningful rather than silently rewriting surrounding work.
Common mistakes
Assuming activity is a full text-diff report
Rich Text revisions have their own history controls. A recent modification timestamp alone does not explain the wording change.
Sources and verification
Based on product documentation checked on 2026-11-04. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.