How to Set Up GitHub Projects for Product Management
GitHub Projects is often seen as an engineering tool, but for PMs at developer-tool or engineering-led companies, working inside GitHub is a strategic advantage. Stakeholder updates, roadmap views, and sprint planning all live in the same system engineers use daily.
This guide covers how to configure GitHub Projects specifically for PM workflows: roadmapping, backlog prioritization, and stakeholder reporting.
Working in GitHub Projects? Turn your spec into dependency-ordered tickets.
Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.
How this works
- We save what you typed. No AI runs on this page.
- You create a free account.
- Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.
Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.
Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy
Step-by-step guide
Set up a Roadmap view using the built-in Roadmap layout
In your GitHub Project, click + to add a new view. Select Roadmap as the layout type. Set the date fields to Start Date and Target Date (add these as custom Date fields first). Group by Milestone or Epic (single select field). This gives you a Gantt-style roadmap that updates automatically as issue dates change.
Create Milestone groups for quarterly themes
In the linked repository, go to Issues > Milestones > New Milestone. Create milestones for each quarter: Q3 2026, Q4 2026. Back in your Project, create a filter view showing only issues assigned to the current milestone. This creates a living quarterly plan that updates as engineers close issues.
Add a Priority field and use it consistently
Add a Priority single-select field with values P0 (Critical), P1 (High), P2 (Medium), P3 (Low). Create a filtered backlog view showing only Backlog status items, sorted by Priority descending. This is your groomed backlog view — share it with engineering before sprint planning.
Configure a Stakeholder View
Create a Table view called Stakeholder View with only these visible fields: Title, Status, Priority, Target Date, and Milestone. Apply a filter to exclude Archived items and Done items older than 14 days. This view is clean enough to present to executives without requiring any GitHub knowledge from the audience.
Use Labels for cross-cutting themes
In the linked repository, create Labels for themes that cut across milestones: Growth, Platform, UX, Compliance, Tech Debt. Apply labels to issues. In GitHub Projects, add a Label field auto-populated from issue labels and group by Label to see work distribution across themes.
Set up the Insights dashboard for PM metrics
Click Insights in your project. Create charts: a Current Iteration Burndown chart showing items remaining vs. days in sprint, a Status distribution chart across Todo/In Progress/Done, and a Priority distribution chart. Review these charts weekly before your PM sync.
Common mistakes
Using GitHub Projects without linked repositories
A GitHub Project with Draft Issues and no linked repositories is just a to-do list. The power comes from linking to real Issues and PRs. Every item should be a real GitHub Issue that engineers work in.
Too many custom fields
Adding 15 custom fields makes the table view unmanageable. Stick to 5-7: Priority, Sprint, Estimate, Status, Type, Owner, and Milestone. Everything else is noise.
Not setting iteration dates
Iteration fields without proper start/end dates break the Roadmap view and velocity charts. Set 2-week iterations for the next 6 months upfront so the system generates accurate sprint timelines.
Tips
Use GitHub Projects's @mention in issue comments to loop in PM without giving them repository push access
Export the Roadmap view as a PNG for board presentations using a browser screenshot of the Roadmap layout
Create a PM Only view with hidden columns that contains internal notes and confidence ratings
GitHub Projects has a GraphQL API — use it to pull project data into your analytics dashboard
How Vantage helps
Vantage connects to GitHub to query your codebase and open issues as context for PRD generation. When a requirement references an existing GitHub Issue or PR, Vantage can surface that context automatically, closing the loop between product specs in Vantage and engineering work in GitHub Projects.