How-ToAug 14, 20268 min read

How to Set Up Scrum in ClickUp (2026 Guide)

ClickUp supports Scrum through its Sprints ClickApp, which adds sprint creation, backlog management, and velocity tracking to its flexible task management platform. While ClickUp is not as opinionated about Scrum as Jira, its customizability lets you build a Scrum workflow that fits your team.

This guide covers the complete Scrum setup in ClickUp, from enabling sprints to tracking velocity.

Spec to tickets

Working in ClickUp? Turn your spec into dependency-ordered tickets.

Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.

0 / 8,000

Where do your tickets live? (optional)

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Step-by-step guide

01

Enable the Sprints ClickApp

Go to Space Settings > ClickApps and enable "Sprints." Configure sprint settings: default duration (1 or 2 weeks), sprint start day (Monday or Wednesday), and whether incomplete items roll over automatically. This adds sprint management to your Space.

02

Set up the backlog

Create a List called "Backlog." Add all potential work items here. Use custom fields: Priority (dropdown), Story Points (number), Sprint Ready (checkbox), and Epic (dropdown or relation). Sort by Priority so the top of the backlog is always the most important unstarted work.

03

Configure estimation

Enable the "Story Points" ClickApp or add a Number custom field called "Points." Choose a point scale (1, 2, 3, 5, 8, 13 is standard). Estimate every backlog item during grooming sessions. Items without estimates should not enter a sprint.

04

Create and plan a sprint

Click "New Sprint" in the Sprints view. Set the start date, end date, and sprint goal. Drag items from the Backlog into the sprint. Monitor total story points against your team velocity. ClickUp shows a capacity bar when velocity data is available.

05

Run the sprint

Use the Sprint Board view during the sprint. It shows tasks grouped by status columns. Track daily progress with the Burndown widget on your dashboard. Use the sprint Board view in standups. Flag blocked items using a "Blocked" status with a red color.

06

Track velocity and review

After completing 2-3 sprints, ClickUp's Velocity chart shows points completed per sprint. Use this for future capacity planning. The Sprint Report shows completed, incomplete, and added-mid-sprint items. Use this data in sprint retrospectives.

Common mistakes

Mixing sprint and non-sprint work

Keep sprint work in dedicated sprint Lists. Mixing sprint items with general project tasks creates confusion about what is committed. Use the Backlog list for uncommitted work and Sprint lists for committed work.

Not using story points

Without story points, you cannot measure velocity or plan sprint capacity. Even if estimates are imperfect, they provide a calibration mechanism. Estimate consistently and improve over time.

Skipping sprint goals

A sprint without a goal is just a batch of tasks. The goal provides a decision framework: when the team needs to make tradeoffs mid-sprint, the goal determines what stays and what is deferred.

Tips

Use ClickUp Automations to move incomplete items to the next sprint automatically

Create a "Sprint Planning" Doc template with agenda and capacity calculations

Use ClickUp's Time Tracking ClickApp to compare estimated vs actual effort

How Vantage helps

Vantage generates sprint-ready tickets with acceptance criteria, story points, and wave assignments. Waves map to sprints: Wave 1 tickets have no dependencies and can start immediately, Wave 2 tickets depend on Wave 1, and so on. This gives your ClickUp sprints a head start with pre-groomed, sequenced work.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Spec to tickets

Working in ClickUp? Turn your spec into dependency-ordered tickets.

Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.

0 / 8,000

Where do your tickets live? (optional)

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading