How-To2026-08-217 min read

How to Set Up Workflows in Linear (Step-by-Step)

Linear workflows define the states issues move through from creation to completion. Unlike Jira which uses complex status transition schemes, Linear keeps workflows simple while allowing team-level customization. Each team in Linear can have its own workflow with custom states, while the default states provide a sensible starting point.

This guide covers setting up Linear workflows that match your team's actual process, including triage states, custom in-progress states, and completion criteria.

Spec to tickets

Planning a sprint in Linear? Turn your spec into dependency-ordered tickets.

Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.

0 / 8,000

Where do your tickets live? (optional)

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Step-by-step guide

01

Access workflow settings

Go to Settings (bottom-left gear icon) > Teams > select your team > Workflow. You will see the default states: Backlog, Todo, In Progress, Done, Cancelled. Each state belongs to a category: Backlog, Unstarted, Started, Completed, or Cancelled. The category controls how issues are counted in cycle and project metrics.

02

Add a Triage state

For teams that receive bug reports or feature requests from external channels, add a "Triage" state in the Backlog category. Create it under Workflow > Add State > name it "Triage" > assign to Backlog category. Issues in Triage are visible to the team but not yet committed to a cycle. The Triage inbox in Linear automatically routes new issues here.

03

Customize In Progress states

If your team has distinct phases like "In Development," "In Review," and "In QA," add separate states for each in the Started category. Go to Workflow > Add State > name it (e.g., "In Review") > set category to "Started." Linear's cycle velocity only counts issues that move from a Started state to a Completed state, so keep the Started category focused.

04

Configure the Done state criteria

Linear has one Done state by default. If your team needs to distinguish between "Deployed to Staging" and "Deployed to Production," add both as Completed-category states. Metrics will count both as complete, but the distinction helps QA and release management. Alternatively, use a "Completed" state and a "Released" state.

05

Set up automatic issue assignment

In Workflow settings, configure the "When an issue moves to In Progress, assign to current user" option. This prevents unassigned in-progress issues and ensures accountability. Enable "When cycle starts, move unstarted issues to Todo" to automatically promote issues when a new cycle begins.

06

Enable triage for incoming issues

In Team Settings > Triage, enable the Triage inbox. Set the "Default state for new issues" to Triage. This means all issues created by non-team-members (via integrations, email, or the request form) land in Triage for review before entering the backlog.

07

Create workflow templates

For repeatable work types (bug reports, feature requests, tech debt), use Linear's Issue Templates to pre-populate state, labels, and description structure. Go to Team Settings > Templates > New Template. Templates appear in the "Create Issue" dropdown, standardizing how new work enters the workflow.

Common mistakes

Too many workflow states

More than 6 states creates decision fatigue. Engineers spend time choosing the right state instead of doing work. Start with 5 states and add more only when there is a genuine need, not to match a process document.

Using Cancelled for everything that does not ship

Cancelled means intentionally stopped. Do not cancel issues that were deprioritized or deferred — move them back to Backlog instead. Cancelled issues affect team metrics and should represent genuine scope decisions.

Not configuring triage for external inputs

Teams that receive issues from Slack bots, customer support, or GitHub integrations need triage. Without it, issues land directly in Backlog and get lost in the noise. Triage ensures every incoming issue gets human review before entering the workflow.

Tips

Keep workflow states to 5-6 maximum — complexity kills adoption

Use Linear's color coding on states to make the board visually scannable

Set up SLA-style cycle time tracking using Linear's built-in cycle time reports

Review workflow effectiveness in sprint retrospectives — update states when the team consistently skips one

How Vantage helps

Vantage generates tickets with wave-based dependencies that map cleanly to Linear workflow states. Tickets in Wave 1 are foundation work; Wave 2 depends on Wave 1 completing. This structure aligns with Linear's state progression and prevents teams from starting dependent work prematurely.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Spec to tickets

Planning a sprint in Linear? Turn your spec into dependency-ordered tickets.

Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.

0 / 8,000

Where do your tickets live? (optional)

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading