How-To2026-08-0210 min read

How to Set Up Product Analytics in Amplitude

Amplitude is one of the most powerful product analytics platforms available. Setting it up correctly from the start saves months of cleanup later. The key is a well-designed event taxonomy: a structured naming convention for all the events your product tracks.

This guide covers the full setup process, from event taxonomy design to building your first actionable dashboard.

Experiment brief

Measuring a change in Amplitude? Write the experiment brief before you ship.

Describe the change and the number you want to move. Vantage turns it into a written brief you can share with eng and data before anything ships.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds an experiment brief from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Step-by-step guide

01

Design your event taxonomy

Before writing any code, define your event naming convention. Use a consistent format like "noun.verb" (e.g., project.created, prd.generated, ticket.exported). Group events by feature area. Document every event with its properties and when it fires.

02

Instrument core user actions

Start with the actions that define your product's core value: user signup, first key action, repeated engagement, and conversion. Do not instrument everything at once. Start with 15-20 core events and expand as needed.

03

Set up user properties

Configure user properties that matter for segmentation: plan type, role, company size, signup date, first value date. These properties let you segment your analysis by user characteristics.

04

Build your first funnel

Create a funnel from signup to first value moment. For most products, this is: Signup > Onboarding Complete > First Core Action > Repeated Use. Identify where users drop off and prioritize fixing those gaps.

05

Set up retention analysis

Configure a retention chart based on your core action. For a PM tool, this might be "Created a project" as the start event and "Returned to the workspace" as the return event. Track weekly and monthly retention.

06

Create a dashboard

Build a dashboard with your key metrics: DAU/WAU/MAU, core funnel conversion, retention curves, and feature adoption rates. Share this dashboard with the product team and review it weekly.

Common mistakes

Instrumenting everything

Tracking every button click and page view creates noise. Focus on events that represent meaningful user actions and business outcomes. You can always add more events later; removing noisy events is harder.

Inconsistent event naming

Mixing formats (click_button, buttonClicked, button.click) makes analysis painful. Choose one convention and enforce it. Document your taxonomy in a shared spreadsheet or wiki.

Not tracking the first value moment

The most important metric for most products is time to first value: how long it takes a new user to experience the product's core benefit. If you do not track this, you cannot optimize onboarding.

Tips

Use Amplitude's Taxonomy feature to manage and govern your events

Set up real-time alerts for critical metrics (e.g., signup conversion drops below 10%)

Create saved cohorts for your key user segments (power users, churned users, new users)

Review your event taxonomy quarterly and deprecate events that nobody uses

How Vantage helps

Vantage connects to Amplitude to pull analytics data into PRD generation. When you create a project, your product analytics ground the AI-generated PRD in real user behavior. This means your specs reflect what users actually do, not assumptions about what they might do.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Experiment brief

Measuring a change in Amplitude? Write the experiment brief before you ship.

Describe the change and the number you want to move. Vantage turns it into a written brief you can share with eng and data before anything ships.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds an experiment brief from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading