How-To2026-10-272 min read

Use Project Labels in Linear

Apply project labels to classify and filter the portfolio independently of issue labels. Agree on a short taxonomy before allowing near-duplicate categories to spread.

Step-by-step guide

01

Check access and scope

Workspace labels and team labels have different availability. Team-scoped project labels require an eligible plan and a project containing that team.

02

Choose taxonomy dimensions

List the portfolio questions labels should answer.

03

Create the label group

Create a workspace label group for a stable dimension such as product area.

  • Worked example: Use Product area: Identity and Delivery type: Customer request as separate dimensions. Do not create Identity-customer-request as a combined label that becomes difficult to maintain.
04

Set selection behavior

Choose single-select or multi-select according to whether values can coexist. Project label groups are single-select by default; enable multiple values only for a dimension where combinations are meaningful.

05

Classify sample projects

Apply labels to a small representative project set.

06

Inspect the filtered portfolio

Create a filtered project view and inspect unlabeled exceptions.

07

Verify the result

The portfolio view returns expected projects and a project with multiple teams uses only valid label scopes.

Common mistakes

Avoid the main failure mode

Project labels do not automatically classify every issue independently. Readers must understand whether a filter targets issue labels or project labels.

Check the handoff edge case

Creating several labels for the same product area fragments portfolio reporting. Keep one accepted spelling and owner for the taxonomy.

Sources and verification

Based on product documentation checked on 2026-10-24. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Spec to tickets

Working in Linear? Turn your spec into dependency-ordered tickets.

Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.

0 / 8,000

Where do your tickets live? (optional)

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading