How-To2026-10-302 min read

Saved Triage Filters in Linear

Save a custom issue view with Triage explicitly included in its status filter. Default views can omit triage issues because they sit outside the normal team workflow.

Step-by-step guide

01

Check access and scope

Triage must be enabled for the team, and you need permission to create the intended shared or personal view.

02

Include Triage status

Open the team issue list and add a status filter including Triage.

03

Narrow the review scope

Add a focused ownership or label filter for the review question.

  • Worked example: Name a view Mobile triage: needs reproduction. Filter for Triage plus the needs-reproduction label so the meeting focuses on evidence gaps rather than the whole backlog.
04

Save the custom view

Save the filtered list as a custom view and name it by its purpose. A filtered team list can be saved using Option/Alt V or its Save view control; a new issue view can also be created from Views.

05

Choose review fields

Choose useful displayed fields such as priority, age and assignee.

06

Process matching issues

Review matching issues and accept, snooze, decline or mark duplicates deliberately.

07

Verify the result

Create a harmless matching issue and confirm it appears; remove the label and confirm it leaves the view.

Common mistakes

Avoid the main failure mode

A saved list is not an automatic routing rule. It displays matching records; it does not assign or accept them.

Check the handoff edge case

Naming a view simply Triage does not explain its scope. Include the owning team or evidence gap so reviewers understand exclusions.

Sources and verification

Based on product documentation checked on 2026-10-24. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Spec to tickets

Working in Linear? Turn your spec into dependency-ordered tickets.

Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.

0 / 8,000

Where do your tickets live? (optional)

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading