What Is Trunk-Based Development? | Vantage

Trunk-Based Development Trunk-based development (TBD) is a source control workflow where all engineers commit directly to a single shared branch (the trunk or main) rather than maintaining long-lived feature branches. Changes are small and frequent — typically multiple times per day per engineer. Commits are kept small enough to be integrated and deployed the same day they are written. Feature flags are used to hide incomplete work from production users while allowing code to be shipped continuously.

Why trunk-based development matters

Long-lived branches are the primary source of integration conflicts and delayed feedback. When a feature branch lives for two weeks, the merge is painful — dozens of competing changes collide, and the integration cost is high. Trunk-based development eliminates this by keeping branches short (hours, not days) and integrating continuously. DORA research consistently shows TBD as one of the strongest predictors of software delivery performance.

How it works

Engineers create short-lived branches (less than one day to two days) and commit frequently. Feature flags hide incomplete work from users. Automated CI runs on every commit. Pull requests are reviewed and merged the same day they are opened. Trunk is always deployable. Releases are decoupled from deploys — you can ship code to production without turning on the user-facing feature. This allows continuous integration without continuous feature release.

Common mistakes

  • Long-lived feature branches defeat the purpose — if a branch lives more than two days, it is no longer trunk-based development

  • No feature flags for incomplete work — you cannot ship a half-built feature without a mechanism to hide it

  • Insufficient test coverage — TBD only works if every commit is covered by automated tests that run in CI

  • No code review discipline — small frequent PRs still require review; without it, quality degrades quickly

  • Confusing TBD with no branching — short-lived branches are still branches; the key is the lifetime, not the existence

Related terms

How Vantage relates

Vantage generates tickets that are scoped to be completable in a single sprint wave. Smaller, dependency-ordered tickets enable the short-lived branches that make trunk-based development practical. When tickets are well-scoped and sequenced, engineers do not need long branches to manage complex changes.

Frequently asked questions

Put product concepts into practice

Vantage connects theory to execution. Generate grounded PRDs, track requirements, and ship with confidence.

Start the PRD

Have a feature in mind? Describe it and Vantage drafts the PRD.

A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading