How-ToAug 14, 20268 min read

How to Set Up Scrum in ClickUp (2026 Guide)

ClickUp supports Scrum through its Sprints ClickApp, which adds sprint creation, backlog management, and velocity tracking to its flexible task management platform. While ClickUp is not as opinionated about Scrum as Jira, its customizability lets you build a Scrum workflow that fits your team.

This guide covers the complete Scrum setup in ClickUp, from enabling sprints to tracking velocity.

Step-by-step guide

Step 1: Enable the Sprints ClickApp

Go to Space Settings > ClickApps and enable "Sprints." Configure sprint settings: default duration (1 or 2 weeks), sprint start day (Monday or Wednesday), and whether incomplete items roll over automatically. This adds sprint management to your Space.

Step 2: Set up the backlog

Create a List called "Backlog." Add all potential work items here. Use custom fields: Priority (dropdown), Story Points (number), Sprint Ready (checkbox), and Epic (dropdown or relation). Sort by Priority so the top of the backlog is always the most important unstarted work.

Step 3: Configure estimation

Enable the "Story Points" ClickApp or add a Number custom field called "Points." Choose a point scale (1, 2, 3, 5, 8, 13 is standard). Estimate every backlog item during grooming sessions. Items without estimates should not enter a sprint.

Step 4: Create and plan a sprint

Click "New Sprint" in the Sprints view. Set the start date, end date, and sprint goal. Drag items from the Backlog into the sprint. Monitor total story points against your team velocity. ClickUp shows a capacity bar when velocity data is available.

Step 5: Run the sprint

Use the Sprint Board view during the sprint. It shows tasks grouped by status columns. Track daily progress with the Burndown widget on your dashboard. Use the sprint Board view in standups. Flag blocked items using a "Blocked" status with a red color.

Step 6: Track velocity and review

After completing 2-3 sprints, ClickUp's Velocity chart shows points completed per sprint. Use this for future capacity planning. The Sprint Report shows completed, incomplete, and added-mid-sprint items. Use this data in sprint retrospectives.

Common mistakes

Mixing sprint and non-sprint work

Keep sprint work in dedicated sprint Lists. Mixing sprint items with general project tasks creates confusion about what is committed. Use the Backlog list for uncommitted work and Sprint lists for committed work.

Not using story points

Without story points, you cannot measure velocity or plan sprint capacity. Even if estimates are imperfect, they provide a calibration mechanism. Estimate consistently and improve over time.

Skipping sprint goals

A sprint without a goal is just a batch of tasks. The goal provides a decision framework: when the team needs to make tradeoffs mid-sprint, the goal determines what stays and what is deferred.

Tips

  • Use ClickUp Automations to move incomplete items to the next sprint automatically
  • Create a "Sprint Planning" Doc template with agenda and capacity calculations
  • Use ClickUp's Time Tracking ClickApp to compare estimated vs actual effort

How Vantage helps

Vantage generates sprint-ready tickets with acceptance criteria, story points, and wave assignments. Waves map to sprints: Wave 1 tickets have no dependencies and can start immediately, Wave 2 tickets depend on Wave 1, and so on. This gives your ClickUp sprints a head start with pre-groomed, sequenced work.

Frequently asked questions