Template — Cybersecurity

PRD Template for Cybersecurity Products

Cybersecurity products face unique requirements: SOC 2 and ISO 27001 compliance, threat modeling for every feature, zero-trust architecture considerations, and the need to document security implications alongside functional requirements.

This template adds security-specific sections to ensure your PRD addresses the rigorous standards expected by security-conscious buyers and auditors.

Template sections

6 sections covering the complete prd workflow.

01

Problem Statement

Describe the security problem or gap. Include threat landscape context: what attack vectors does this address? What is the current risk exposure? Reference CVE databases, MITRE ATT&CK framework, or internal security audit findings.

02

Threat Model

Document the threat model using STRIDE (Spoofing, Tampering, Repudiation, Information Disclosure, Denial of Service, Elevation of Privilege). Identify threat actors, attack surfaces, and trust boundaries. Include a data flow diagram showing where sensitive data moves.

03

Compliance Requirements

Specify applicable standards: SOC 2 Type II (which trust service criteria), ISO 27001 (which controls), FedRAMP (if government), PCI DSS (if payment data). Document how this feature affects existing compliance certifications and what audit evidence it must generate.

04

Security Architecture

Document security-specific architecture: encryption standards (AES-256, TLS 1.3), key management approach, authentication mechanisms, authorization model (RBAC/ABAC), and audit logging requirements. Reference the zero-trust principle where applicable.

05

Requirements

Standard requirements with security-specific acceptance criteria: penetration tested, code reviewed for OWASP Top 10, audit log captures all security events, encryption at rest and in transit verified, access controls tested.

06

Incident Response

Document how this feature integrates with incident response: what alerts does it generate, what runbooks need updating, what forensic data does it preserve. Features in security products must support incident investigation, not just prevention.

Copy-paste template

# [Feature] PRD — Cybersecurity

## Problem Statement
[Security problem with threat context]

## Threat Model (STRIDE)
| Threat | Description | Mitigation |
|---|---|---|
| Spoofing | [Threat] | [Mitigation] |
| Tampering | [Threat] | [Mitigation] |

## Compliance
- SOC 2: [Criteria affected]
- ISO 27001: [Controls affected]
- Audit evidence: [What to generate]

## Security Architecture
- Encryption: [AES-256 at rest, TLS 1.3 in transit]
- Auth: [Mechanism]
- Audit logging: [Events to capture]

## Requirements
| ID | Description | Priority | Security Impact |
|---|---|---|---|
| R1 | ... | P0 | [STRIDE category] |

Frequently asked questions

Generate instead of filling in templates

Connect your tools, and Vantage generates the content using real product data. Free to start.

Free to start. No credit card required.

Related reading