Template — Marketplace

PRD Template for Marketplace Products

Marketplace PRDs must address both sides of the market simultaneously. Every feature affects the balance between supply and demand.

This template adds marketplace-specific sections for trust and safety, liquidity metrics, and cross-side impact analysis.

Template sections

4 sections covering the complete prd workflow.

01

Supply and Demand Impact

Document the impact on both marketplace sides: does this improve supplier experience, buyer experience, or both? What is the expected effect on liquidity?

02

Trust and Safety

Document trust implications: fraud risk, content quality, dispute resolution, identity verification. Include the moderation approach.

03

Marketplace Metrics

Include take rate, GMV, liquidity (% of listings transacted), time-to-first-transaction, and repeat transaction rate.

04

Network Effects

Document how this feature strengthens or weakens network effects: attracting more supply, improving matching, or creating switching costs.

Copy-paste template

# [Feature] PRD — Marketplace

## Supply/Demand Impact
- Supply side: [Impact]
- Demand side: [Impact]
- Liquidity effect: [Improves / Neutral / Risk]

## Trust & Safety
- Fraud risk: [Low / Medium / High]
- Moderation: [Automated / Human / Hybrid]

Frequently asked questions

Generate instead of filling in templates

Connect your tools, and Vantage generates the content using real product data. Free to start.

Free to start. No credit card required.

Related reading