Template for Linear — SaaS

Sprint Planning Template: Linear for SaaS Teams

Linear was built for SaaS teams. Its Cycles, Triage, and GitHub integration create a sprint workflow that matches continuous delivery. This template maximizes Linear for SaaS shipping cadence.

Use this template to run efficient cycle planning that takes under 30 minutes with a groomed backlog.

Template sections

5 sections covering the complete sprint planning workflow.

01

Triage Before Planning

Process all Triage items before cycle planning. Each item gets: assigned to a team, estimated, and prioritized. Items without clear scope go to the Backlog with a needs-spec label. The goal is zero items in Triage at cycle start.

02

Cycle Capacity from Velocity

Pull the last 3 cycle velocities from Linear Insights. Average them and plan at 75%. Account for team availability (PTO, on-call rotation). In Linear, set the cycle scope to match your capacity target.

03

SaaS Priority Framework

Prioritize cycle items using SaaS-specific criteria: P0 (production incidents, security), P1 (customer-blocking, revenue-impacting), P2 (feature work on roadmap), P3 (improvements, tech debt). Linear priority levels map directly to this framework.

04

GitHub Integration Setup

Link Linear issues to GitHub PRs. When a PR merges, Linear auto-transitions the issue. When it deploys (via GitHub Actions), mark the issue Done. This creates a fully automated deployment pipeline visible in Linear.

05

Cycle Retrospective

Use Linear Insights at cycle end: completed vs planned scope, cycle time distribution, and carry-over issues. Document one improvement action for the next cycle.

Copy-paste template

# Cycle [N] — SaaS (Linear)

## Cycle Goal
[One sentence]

## Capacity
- 3-cycle velocity avg: [X] points
- Planned at 75%: [Y] points
- Availability: [Names + PTO]

## Priority Breakdown
- P0 (production): [Count]
- P1 (customer-blocking): [Count]
- P2 (roadmap): [Count]
- P3 (improvements): [Count]

Frequently asked questions

Generate instead of filling in templates

Connect your tools, and Vantage generates the content using real product data. Free to start.

Free to start. No credit card required.

Related reading