Template — SaaS

Bug Report Checklist for SaaS Products

SaaS bugs can affect a single tenant, a subset of tenants, or all tenants. Every bug report must determine the blast radius and assess SLA impact. Multi-tenant debugging requires different techniques than single-tenant applications.

This template adds SaaS-specific triage criteria to the standard bug report.

Template sections

4 sections covering the complete bug report workflow.

01

Tenant Blast Radius

Determine how many tenants are affected: Single tenant (configuration issue), Subset of tenants (feature-flag rollout, plan-specific), All tenants (infrastructure or shared-code issue). The blast radius determines severity: all-tenant bugs are always P0.

02

SLA Impact Assessment

Check SLA impact: Is uptime affected? Is data integrity compromised? Is the feature covered by an SLA? Calculate SLA credit exposure based on affected tenants and downtime duration. Document the SLA clock start time.

03

Multi-Tenant Debugging

SaaS debugging steps: Reproduce in a test tenant (never in a customer tenant), Check if the bug is tenant-configuration-specific, Verify data isolation (has tenant A data leaked to tenant B?), and Check if the bug correlates with plan tier or feature flag state.

04

Customer Impact Triage

Assess customer impact: Which plans are affected (free/pro/enterprise)? Are paying customers affected? Is the customer in a critical workflow (onboarding, end-of-quarter)? Enterprise customers with dedicated SLAs get escalated priority.

Copy-paste template

## SaaS Bug Report

### Summary
[Bug description]

### Blast Radius
- Scope: [Single tenant / Subset / All tenants]
- Affected tenants: [Count or identifiers]
- Plans affected: [Free / Pro / Enterprise]

### SLA Impact
- Uptime affected: [Yes / No]
- SLA credit exposure: [$Amount]
- Clock started: [Timestamp]

### Data Isolation
- Cross-tenant leak: [Confirmed / Ruled out / Under investigation]
- Data integrity: [Intact / Compromised]

### Steps to Reproduce
1. [Step] (reproduced in test tenant)

### Severity
- Technical: [Blocker/Critical/Major/Minor]
- Blast radius: [Single/Subset/All]
- SLA: [At risk / Not affected]

Frequently asked questions

Generate instead of filling in templates

Connect your tools, and Vantage generates the content using real product data. Free to start.

Spec to tickets

Turn your spec into dependency-ordered tickets.

Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.

0 / 8,000

Where do your tickets live? (optional)

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading