Use Case

AI Prototype Generator

Generate clickable prototypes directly from your PRD. Create multiple variants, share public links for stakeholder feedback, and compare A vs B before a single line of production code is written.

The problem

A PRD describes what to build, but stakeholders often struggle to visualize it. “Show me what this will look like” is one of the most common stakeholder requests, and answering it traditionally requires design time: a designer reads the spec, creates wireframes or mockups, iterates on feedback, and eventually produces something the team can align on.

This process takes days to weeks and creates a bottleneck between spec and engineering. Meanwhile, different stakeholders imagine different things when reading the same PRD. By the time the prototype is ready, the team may have already started building based on divergent interpretations.

How Vantage solves it

PRD-to-prototype in minutes

Generate an interactive HTML prototype directly from your PRD. Vantage reads the requirements and user flows described in the spec and produces a clickable prototype that demonstrates the intended experience. No design tool expertise required.

Multiple variants for comparison

Not sure between two approaches? Generate both. Each variant is a complete prototype that can be evaluated independently. Compare side by side to see trade-offs in user flow, information density, and interaction patterns before committing to one direction.

Shareable feedback links

Each prototype gets a public link that works without a Vantage account. Share it with stakeholders, executives, or pilot users. They interact with the prototype and leave feedback that you can review and act on.

Who it is for

  • PMs who need to get stakeholder alignment before engineering starts.
  • Teams without dedicated design capacity for early-stage exploration.
  • Anyone who has heard “I will know what I want when I see it” from a stakeholder.

Results

Minutes

from PRD to clickable prototype

Multiple

variants for side-by-side comparison

Shareable

public links for stakeholder feedback

Frequently asked questions

Related use cases

Show, do not tell

Generate clickable prototypes from your PRD in minutes. Share with stakeholders, collect feedback, compare variants. Free to start.

Start the PRD

Have a feature in mind? Describe it and Vantage drafts the PRD.

A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading