How-To2026-10-272 min read

Roll Up Feature Evidence in Notion

Add a rollup over a feature-to-research relation to summarize linked evidence. The number is a count of linked records, not a count of independent customers or proof of impact.

Step-by-step guide

01

Check access and scope

A working relation between Features and Research is required. Agree on what one research record represents before counting it.

02

Inspect source relations

Check the Features relation contains the intended research records.

03

Create the rollup

Add a Rollup property and choose that relation.

  • Worked example: A feature with four notes from one interview should not outrank another feature with three independent interviews solely because the first rollup is larger. Record participant identity separately where access allows.
04

Choose the count calculation

Select a populated source property and the appropriate count calculation. The selected relation, source property and calculation jointly define the result; test each choice with records whose expected count is known.

05

Record evidence quality

Create a separate source-quality or interpretation field.

06

Check empty and duplicate cases

Inspect a feature with duplicate notes and a feature with no evidence.

07

Verify the result

Adding one linked note changes the summary as expected and removing the relation reverses it.

Common mistakes

Avoid the main failure mode

A blank or unexpected count often reflects missing relations or an unsuitable source property. Investigate the records before changing the formula.

Check the handoff edge case

A higher evidence count may represent multiple notes from one interview. Keep participant context alongside aggregate counts.

Sources and verification

Based on product documentation checked on 2026-10-24. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Start the PRD

Have a feature in mind? Describe it and Vantage drafts the PRD.

A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading