How-ToAug 14, 20268 min read

How to Track OKRs in Monday.com (2026 Guide)

Monday.com does not have a dedicated OKR feature, but its flexible board system and formula columns make it possible to build a structured OKR tracking system. The visual interface makes OKR reviews engaging, and dashboards provide at-a-glance progress for leadership.

This guide covers how to build a complete OKR tracking system in Monday.com from scratch.

Spec to tickets

Working in Monday.com? Turn your spec into dependency-ordered tickets.

Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.

0 / 8,000

Where do your tickets live? (optional)

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Step-by-step guide

01

Create an OKR board

Create a new board called "OKRs Q3 2026." Add groups for each objective. Within each group, add items for each key result. Add columns: Owner (person), Target (number), Current (number), Progress (formula: Current/Target*100), Status (status: On Track, At Risk, Off Track), Notes (text).

02

Set up the progress formula

In the Progress column, use the formula: IF({Current}/{Target}*100 > 100, 100, ROUND({Current}/{Target}*100, 0)). This auto-calculates progress as a percentage. Add a Battery widget on the dashboard that uses this column for visual progress bars.

03

Create a hierarchy with subitems

Use Monday.com's subitems feature to nest key results under objectives. Each top-level item is an objective, and subitems are key results. This creates a visual hierarchy. Enable the "Summary" feature on columns to roll up key result progress to the objective level.

04

Link to execution boards

Add a "Link to Board" column that connects each key result to the project board where the actual work happens. When someone asks "what are we doing to hit this KR," the link takes them directly to the execution plan.

05

Build an OKR dashboard

Create a Monday.com Dashboard with widgets: Battery for each objective (showing % progress), Chart showing objectives by status, Table listing all key results below target, and a Numbers widget showing overall OKR health (average progress across all objectives).

06

Schedule weekly updates

Create an automation: every Monday at 9 AM, send an update request to all key result owners asking them to update the "Current" column. Use the Updates section on each item for qualitative commentary. Review the dashboard in your weekly leadership sync.

Common mistakes

Using statuses without formulas

Manually setting "On Track" vs "At Risk" is subjective. Use formula columns to auto-calculate progress, then set thresholds: > 70% of expected progress = On Track, 50-70% = At Risk, < 50% = Off Track. This removes bias from status reporting.

Not connecting OKRs to execution

An OKR board disconnected from project boards is a strategy document, not a tracking system. Always link key results to the work that delivers them. If a key result has no linked project, it is aspirational, not actionable.

Quarterly setup from scratch

Rebuilding the OKR board every quarter wastes time. Create a template board with the structure, formulas, and automations. Duplicate it each quarter and update the objectives and key results.

Tips

Use Monday.com's color-coded Status column for at-a-glance OKR health

Create a "OKR Review" meeting item template with a pre-populated agenda

Use the Mirror column to surface OKR progress on other boards without duplicating data

How Vantage helps

Monday.com tracks your OKR progress. Vantage connects your product execution to those objectives. When creating a PRD in Vantage, reference your OKRs as context. The AI ensures your specs align with strategic goals, and conflict detection catches when multiple projects target competing objectives.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Spec to tickets

Working in Monday.com? Turn your spec into dependency-ordered tickets.

Paste the feature or spec. Vantage pulls out the requirements and breaks them into tickets, ordered by what blocks what, ready to groom with your team.

0 / 8,000

Where do your tickets live? (optional)

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD and dependency-ordered tickets from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading