Product intelligence for design teams
Get the data behind every design decision. Generate prototype variants for early alignment. Know when requirements change before investing in high-fidelity work.
Four problems Vantage solves for design teams
Each maps to a real workflow challenge that design teams face when building products.
Understand the "why" behind every design brief
The problem
Designers receive PRDs with requirements but rarely see the data behind them. Why are we prioritizing this flow over that one? What analytics drove the decision? The context lives in Slack threads and dashboards that designers are not looped into.
How Vantage solves it
Vantage's connected product intelligence traces every requirement to its source data. When a designer reads a spec, they can click any requirement and see the Amplitude funnel, Slack thread, or user research that informed it. Context is not relayed through meetings. It is directly accessible.
- Click-through from any spec requirement to the data that drove it
- See the analytics, conversations, and research behind design decisions
- No more "why are we doing this?" questions in design reviews
- Shared context between product, design, and engineering
Generate prototype variants before opening Figma
The problem
Designers often invest hours in Figma before stakeholders align on direction. Getting early alignment usually means long meetings, vague whiteboard sessions, or waiting for a PM to describe what they want.
How Vantage solves it
Vantage generates clickable prototype variants from specs. Share public feedback links with stakeholders. Compare options side by side and pick a direction before design invests in high-fidelity work. This is not a replacement for Figma. It is a way to align on direction faster.
- Multiple prototype variants generated from the same spec
- Public feedback links for async stakeholder review
- Side-by-side comparison to pick a direction
- Save design time by aligning on direction before high-fidelity work
Know when requirements change after handoff
The problem
Requirements change after design handoff. A Slack thread shifts direction, analytics data changes, or a new constraint surfaces. Designers find out in standup, or worse, after they have already built screens based on outdated requirements.
How Vantage solves it
Vantage tracks live connections between specs and their source data. When a requirement changes because underlying data shifted, the system flags it. Designers see what changed, when, and why, instead of discovering stale requirements after investing design time.
- Automatic staleness detection when connected data sources change
- Clear visibility into which requirements changed and why
- Version history showing what changed across spec rebuilds
- Designers stay informed without being in every Slack thread
User journeys grounded in real product data
The problem
User journey mapping often starts from assumptions or interviews. Designers want to know the actual flows users take, where they drop off, and what analytics say about current behavior.
How Vantage solves it
Vantage generates user journeys grounded in connected analytics and product data. Three formats are available: written narratives, step-by-step flows, and visual journeys. Each step references real data points, so design decisions are informed by actual user behavior.
- User journeys generated from connected analytics data
- Three formats: narrative, step-by-step, and visual
- Each step references source data points
- Informed design decisions grounded in real user behavior
Vantage for other roles
Frequently asked questions
Design with data, not assumptions
See the analytics behind every requirement. Align on direction before opening Figma.
Have a feature in mind? Describe it and Vantage drafts the PRD.
A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.
How this works
- We save what you typed. No AI runs on this page.
- You create a free account.
- Vantage builds a PRD from it inside your own workspace.
Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.
Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy
Free to start. No credit card required.