FigmaVantage + Figma

Connect every design to the decision that shaped it

Vantage links Figma frames to product requirements so your team always knows why a design exists. When designs change, connected requirements surface for review.

Figma / Checkout Redesign
Page: Checkout FlowFinal
Cart Summary
Payment Form
Page: Mobile VariantsDraft
iOS
Android
Responsive Web
12 frames across 3 pagesLast edited 2h ago
vantageOS Workspace
Figma Linked
Design LinkedR-18

Payment Form mapped to requirement

Figma frame "Payment Form" linked to R-18: Checkout payment capture.

Design Changed

Mobile Variants updated

3 frames modified. Requirements R-18, R-19 flagged for review. Rebuild recommended.

Linked: 12 frames to 5 requirements
watching

Three steps to design-decision alignment

Connect Figma to Vantage and keep your designs grounded in product decisions.

01

Connect your Figma account

Authorize via Figma OAuth. Choose which files and projects to link. Vantage reads structure and metadata only.

02

Link frames to requirements

Map Figma frames and prototype screens to specific requirements in your Vantage workspace. Each screen traces to a decision.

03

Design changes trigger reviews

When linked frames are modified, Vantage flags connected requirements. Your team reviews the impact before deciding to rebuild.

CAPABILITIES

Built for design-driven product teams

Not just file storage. A live connection between what you design and why you designed it.

Prototype-to-requirement linking

Link individual prototype screens to specific PRD requirements. When stakeholders ask why a screen exists, the answer is one click away.

Design change detection

Vantage watches linked Figma frames for changes. When a designer modifies a connected screen, the linked requirements are flagged for review and potential rebuild.

Import Figma files as context

Use Figma files as grounding context when generating PRDs, user journeys, or tickets. Vantage reads frame names, page structure, and component metadata to inform output.

Rebuild when designs evolve

When your design team iterates and frames change, Vantage can rebuild connected PRD sections using the updated design context. You review changes and approve before anything ships.

Enterprise-grade security by default

Your design files are private. We build safeguards to keep them that way.

Strict Data Privacy

We do not use customer data or Figma files to train AI models. Your design intellectual property stays yours.

Encryption In Transit and At Rest

All data transferred between Figma and vantageOS is encrypted using TLS 1.2+ and stored securely using AES-256.

Access Audits and Compliance

We align with GDPR, HIPAA, and SOC2 security guidelines to manage workspace access roles rigorously.

“Our designers used to ship screens with no trace to the original requirement. Vantage closed that gap completely.”

Om Pancholi - The Sleep Company

SOC 2GDPREncrypted
Figma plugin

Bring a Vantage prototype into Figma

The integration brings your designs into Vantage. The plugin goes the other way — it rebuilds a prototype Vantage generated as editable Figma layers, with real text, real vectors and auto-layout, then syncs your edits back.

How the plugin works

Explore more

Frequently asked questions

Start using Figma with Vantage

Connect your Figma workspace in under 2 minutes. Every design linked to a decision.

Start the PRD

Have a feature in mind? Describe it and Vantage drafts the PRD.

A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading