Use Case

Generate prototype variants for stakeholder alignment

A devtools team needed alignment on a dashboard redesign. They generated three prototype variants, shared feedback links with five stakeholders, and picked a direction in two days. No review meetings. No slide decks. Just async feedback on clickable prototypes.

1 week

Typical time lost waiting for design mockups before stakeholders can align on direction

Prototype variants let you align on direction before design work begins

3+ variants

generated in parallel from the same spec

Public links

for async feedback without accounts

Compare mode

side-by-side variant comparison

How prototype generation works

Generate variants, share for feedback, compare side by side, and pick a direction. All before design opens Figma.

01

Generate variants from the same spec

Select a PRD or a set of requirements and generate multiple prototype variants in parallel. Each variant interprets the same requirements with a different approach: layout, interaction pattern, or information hierarchy. A devtools team generated three variants of their dashboard redesign in under five minutes, each emphasizing different user workflows.

  • Multiple variants generated in parallel from the same requirements
  • Each variant explores a different design direction
  • Grounded in your actual product data and requirements
  • Generate additional variants any time without starting over
Variant Generator
Variant A
Single-column
Variant B
Two-column
Variant C
Tabbed
Generated from: Dashboard Redesign PRD
02

Share public feedback links

Each prototype gets a shareable link that works without a Vantage account. Send it to stakeholders, customers, or anyone whose feedback matters. They can click through the prototype, leave comments on specific screens, and vote on what works. No scheduling a review meeting. No building a slide deck. Just share the link and collect feedback asynchronously.

  • Public links that work without a Vantage account
  • Screen-level commenting for specific feedback
  • Async feedback collection, no meetings required
  • Track who viewed and commented on each variant
Feedback Link
Variant A -- DashboardLive
vantageos.tech/proto/dash-v1-a3k9...
Sarah (Design Lead)Viewed, 3 comments
Mike (VP Product)Viewed, voted
Alex (Eng Lead)Not yet viewed
03

Compare A vs B side by side

Open two variants in compare mode to see them side by side. Walk through each screen and see how the same requirement is addressed differently. Feedback and votes from stakeholders are visible on both sides. Mark a winner and move forward with a clear direction before design opens Figma.

  • Side-by-side comparison of any two variants
  • Screen-by-screen walkthrough of differences
  • Stakeholder feedback visible on both sides
  • Mark a winning variant to set direction for design
Compare Mode
Variant A
3 votes5 comments
Variant B
1 vote2 comments
Mark Variant A as winner
04

Feed the winning direction into design

Once a variant is selected, it becomes the reference for the design phase. The prototype links to the requirements it implements, so the designer knows not just what it should look like, but why each screen exists. When the designer has questions about a specific screen, they can trace it back to the requirement and its source data.

  • Selected variant becomes the design reference
  • Each screen links to the requirement it implements
  • Designers can trace decisions to source data
  • Reduces back-and-forth between PM and design
Design Reference
WinnerVariant A -- Single-column
Screen 1 linked to R-01: Dashboard overview
Screen 2 linked to R-04: Analytics panel
Screen 3 linked to R-07: Settings
“The generated PRD is one of the best I've seen in the business. Crisp, not too long, to the point and got everything right.”

Nikhil

India Today

Frequently asked questions

Related use cases

Align on direction before design starts

Generate prototype variants, share feedback links, compare side by side. Free to start.

Start the PRD

Have a feature in mind? Describe it and Vantage drafts the PRD.

A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading