Product workflows2026-10-283 min read

Export Figma Assets: Names, Formats and Scale

Select the intended asset, choose an appropriate export format and scale, then verify the exported file outside Figma. A clear naming convention and a real import check are more useful than sending a folder of visually similar versions.

Before you start: Have file access that permits export and agree on the destination platform. Ask the developer which files should remain vectors and which need raster sizes before configuring exports.

Worked example: For a settings screen, deliver a vector settings icon and a raster illustration at the required density. Keep the screenshot used for review separate from the assets intended to ship.

Step-by-step guide

01

Inventory the deliverables

List the individual icons and illustrations required by the screen. Exclude review frames and background decoration that the application already draws through code or existing components.

02

Name source layers clearly

Use names that describe the asset’s purpose and state. Keep density or theme suffixes consistent with the repository so a developer can identify the intended file without opening every export.

03

Choose format deliberately

Use vector or raster output according to the consuming component. Check transparency and text handling with the developer instead of assuming every visible object should become a PNG.

04

Configure the export

Select the asset and add the required export settings. Check scale and suffix for each raster output; do not multiply vector exports simply to imitate raster density conventions.

05

Inspect outside the editor

Open the exported files, inspect their dimensions and place them against the target background. Confirm that clipping, unexpected padding or an opaque background has not changed the intended result.

06

Import a sample into the app

Have the developer use one asset through the normal build pipeline. If rendering or optimization changes it, fix the export contract before delivering the remaining set.

Common mistakes

Exporting the review frame

A screenshot of the entire screen is not a usable icon or illustration. Export only the implementation asset’s intended bounds.

Renaming only downloaded files

Future exports revert to confusing source names. Maintain the contract in the Figma layer names and export settings.

Assuming scale means layout size

Raster density and displayed dimensions are different decisions. Agree on both with the consuming application.

Tips

Keep review screenshots and shipping assets in separate folders.

Test transparent assets against both light and dark backgrounds.

Record the consuming component beside unusual export requirements.

Sources and verification

Based on product documentation checked on 2026-10-24. This is a documentation-based guide, not a hands-on benchmark. Features and availability can change.

Frequently asked questions

Spend less time on setup, more on decisions

Vantage connects your tools and generates specs grounded in real data. Free to start.

Start the PRD

Have a feature in mind? Describe it and Vantage drafts the PRD.

A few sentences is enough: the problem, who has it and what you want to change. Vantage turns it into a structured PRD with requirements you can edit.

0 / 8,000

How this works

  1. We save what you typed. No AI runs on this page.
  2. You create a free account.
  3. Vantage builds a PRD from it inside your own workspace.

Why ask for an account? We’re a small team, and a full generation runs a multi-step AI pipeline that costs us real money. So we tie it to a free account instead of running it anonymously. You also get to keep the result and edit it.

Your text is only used to create your project, and it stays private to your account. If you don’t sign up, we delete it after 7 days. Privacy policy

Free to start. No credit card required.

Related reading